720 Harris Ave
Austin, TX 78705
720 Harris Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 720 Harris Ave, Austin, TX 78705. The most recent, filed September 9, 2013, covers: “Harris avenue alley improvements”.
Compiled from City of Austin records · updated Sep 9, 2013
- Projects
- 1
- 1 filings
- Latest filing
- Sep 9, 2013
- since Sep 9, 2013
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 720 Harris Ave
What is being built at 720 Harris Ave?
The latest filing (City of Austin case 10925302, September 9, 2013) covers harris avenue alley improvements.
How many permits and filings does 720 Harris Ave have?
1 filing across 1 project, from September 9, 2013 to September 9, 2013.
What is being built near Austin Independent School District in Austin?
720 Harris Ave is about 157 m from Austin Independent School District (3308 Hampton Rd). Its latest filing is for harris avenue alley improvements.
Is there other construction near 720 Harris Ave?
Yes. Nearby filings include 717 Harris Ave (replace old fpe panel and meter can, Mar 25, 2024); 719 Harris Ave (this option is going to include performing a tunnel underneath the foundation on the left side of the home. we will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new pvc and will bring out the pvc to the left side of the home and will tie back in to the pvc line that is located on that left side. this is going to take care of the cast-iron for units a. we will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. then we will go from the back of unit b and well have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen and toilet drain and will be redoing with pvc and will tie on to the existing pvc that is located under home. we are going to be canceling out the cast-iron line that runs about 80 feet across the two units. once we have all the pvc set in place we will strap to foundation to prevent any movement in the future and will thoroughly test once we are completed. we are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector, Sep 19, 2025); 715 Harris Ave (new construction accessory to primary use 2-story accessory structure with 1 bedroom and 1 bath, Jan 10, 2026).
How do I get alerts for new permits at 720 Harris Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 717 Harris AveMar 25, 2024Replace old fpe panel and meter can · 47 m away
- 719 Harris AveSep 19, 2025This option is going to include performing a tunnel underneath the foundation on the left side of the home. we will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new pvc and will bring out the pvc to the left side of the home and will tie back in to the pvc line that is located on that left side. this is going to take care of the cast-iron for units a. we will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. then we will go from the back of unit b and well have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen and toilet drain and will be redoing with pvc and will tie on to the existing pvc that is located under home. we are going to be canceling out the cast-iron line that runs about 80 feet across the two units. once we have all the pvc set in place we will strap to foundation to prevent any movement in the future and will thoroughly test once we are completed. we are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector · 52 m away
- 715 Harris AveJan 10, 2026New construction accessory to primary use 2-story accessory structure with 1 bedroom and 1 bath · 55 m away
- 719 Carolyn AveNov 19, 2024Replacement of complete existing central heat and air system with or without duct work · 65 m away
- 3410 GreenwayDec 13, 2025Interior remodel - see attachments for full scope of work prewiring and fixtures 1 - flood light 1 - recess can in the front porch 2 - recess can back patio 2 - recess cans in the powder bath change foyer fixture to 4 - recess cans **adding level 2 ev charger to the remodel. revision: rewired all lights and change devices for receptacles · 75 m away
- 715 Carolyn AveMar 26, 2025Interior remodel of garage apartment adu · 83 m away
- 708 Harris AveMar 12, 2025Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 716 Landon LnMay 28, 2026Replacement of complete existing central heat and air system with or without duct work · 108 m away
- 704 Harris AveMar 4, 2025New pool and concrete patio · 123 m away
- 3501 Woodrow StNov 26, 2024Replacement of an existing water heater 3501 woodrow · 126 m away
- 3404 Hampton RdMar 23, 2026New irrigation system installation · 131 m away
- 705 Carolyn AveSep 19, 2024Replacement of complete existing central heat and air system with or without duct work · 143 m away