708 Harris Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 708 Harris Ave, Austin, TX 78705. The most recent, filed March 12, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Mar 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 12, 2025
- since Mar 12, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedMar 7, 2025
- IssuedMar 12, 2025
- WorkMar '25 – Sep '25
- Final inspectionMar 24, 2025
Passed final inspection Mar 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-027462 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 708 Harris Ave
What is being built at 708 Harris Ave?
The latest filing (City of Austin permit 2025-027462 MP, March 12, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 708 Harris Ave have?
1 filing across 1 project, from March 12, 2025 to March 12, 2025.
Is there other construction near 708 Harris Ave?
Yes. Nearby filings include 704 Harris Ave (new pool and concrete patio, Mar 4, 2025); 700 Harris Ave (emergency repair on overhead service after austin energy disconnected for safety reasons, Apr 23, 2024); 705 Carolyn Ave (replacement of complete existing central heat and air system with or without duct work, Sep 19, 2024).
How do I get alerts for new permits at 708 Harris Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 704 Harris AveMar 4, 2025New pool and concrete patio · 27 m away
- 700 Harris AveApr 23, 2024Emergency repair on overhead service after austin energy disconnected for safety reasons · 59 m away
- 705 Carolyn AveSep 19, 2024Replacement of complete existing central heat and air system with or without duct work · 67 m away
- 715 Carolyn AveMar 26, 2025Interior remodel of garage apartment adu · 75 m away
- 715 Harris AveJan 10, 2026New construction accessory to primary use 2-story accessory structure with 1 bedroom and 1 bath · 77 m away
- 717 Harris AveMar 25, 2024Replace old fpe panel and meter can · 91 m away
- 720 Harris AveSep 9, 2013Harris avenue alley improvements · 97 m away
- 719 Carolyn AveNov 19, 2024Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 719 Harris AveSep 19, 2025This option is going to include performing a tunnel underneath the foundation on the left side of the home. we will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new pvc and will bring out the pvc to the left side of the home and will tie back in to the pvc line that is located on that left side. this is going to take care of the cast-iron for units a. we will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. then we will go from the back of unit b and well have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen and toilet drain and will be redoing with pvc and will tie on to the existing pvc that is located under home. we are going to be canceling out the cast-iron line that runs about 80 feet across the two units. once we have all the pvc set in place we will strap to foundation to prevent any movement in the future and will thoroughly test once we are completed. we are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector · 110 m away
- 3501 Woodrow StNov 26, 2024Replacement of an existing water heater 3501 woodrow · 111 m away
- 702 Carolyn AveMay 20, 2026Addition/ interior remodel to existing 1-story single-family residential to include: partial porch conversion to laundry room; full interior remodel; 2nd story addition within attic footprint to include: 2 bedroom 1 bath with storage · 118 m away
- 604 Harris AveDec 19, 2025Replace central ac with minisplit system · 119 m away