3509 Greenway
Austin, TX 78705
Backyard outdoor shower permitted at 3509 Greenway
A backyard outdoor shower is covered by a City of Austin plumbing permit filed January 4, 2026. The permit description says the shower stall will be about 4 by 7 by 7 feet, with its drain connected to a French drain.
Summarized from City of Austin records · updated Jan 4, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 4, 2026
- since Jan 4, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledOutdoor shower in backyard stall will be approx 4ft x 7ft x 7 ft tall so about 30 sq ft in area. pan drain will be connected so gray water goes to large perforated pvc pipe over french drain. shower water will come from two existing outside spigots connected using washer/dryer protected/braided hoses and will be disconnected and drained over winter freezes. i have verbally cleared the gray water to french drain with residential building inspections that my property is not in a gray water restricted area so it is okay. also verbally cleared with residential zoning department -- both departments informed me i only need a standalone residential permit since i am the homeowner
- AppliedNov 12, 2025
- IssuedJan 4, 2026
- WorkJan '26 – Jan '26
- Final inspectionJan 6, 2026
Passed final inspection Jan 6, 2026.
Permit & project history
1 projectOutdoor shower in backyard stall will be approx 4ft x 7ft x 7 ft tall so about 30 sq ft in area. pan drain will be connected so gray water goes to large perforated pvc pipe over french drain. shower water will come from two existing outside spigots connected using washer/dryer protected/braided hoses and will be disconnected and drained over winter freezes. i have verbally cleared the gray water to french drain with residential building inspections that my property is not in a gray water restricted area so it is okay. also verbally cleared with residential zoning department -- both departments informed me i only need a standalone residential permit since i am the homeowner
Outdoor shower in backyard stall will be approx 4ft x 7ft x 7 ft tall so about 30 sq ft in area. pan drain will be connected so gray water goes to large perforated pvc pipe over french drain. shower water will come from two existing outside spigots connected using washer/dryer protected/braided hoses and will be disconnected and drained over winter freezes. i have verbally cleared the gray water to french drain with residential building inspections that my property is not in a gray water restricted area so it is okay. also verbally cleared with residential zoning department -- both departments informed me i only need a standalone residential permit since i am the homeowner
City of Austin permitPlumbing PermitFinal- Record
- 2025-145243 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3509 Greenway
What is being built at 3509 Greenway in Austin?
A City of Austin plumbing permit describes an outdoor shower in the backyard. The permit, 2025-145243 PP, was filed January 4, 2026.
When was the outdoor shower at 3509 Greenway permitted?
The City of Austin permit was filed January 4, 2026. Its permit number is 2025-145243 PP.
How big will the outdoor shower at 3509 Greenway be?
The permit description gives the stall dimensions as approximately 4 feet by 7 feet by 7 feet tall, with an area of about 30 square feet.
How will the outdoor shower drain?
The permit description says the shower pan drain will connect to a large perforated PVC pipe over a French drain.
Is a new home being built at 3509 Greenway?
The record provided is for a plumbing permit describing a backyard outdoor shower, not a new home.
Also being built nearby
All of 78705- 3505 GreenwayAug 6, 2026Addition and remodel of existing non-conplying sfr. replacement of existing sideing windowsm and exterior doors. remodel of front entry porch primary bedroom and bathroom and covered porch. addition to existing noncomplying carport. addition to the 2nd floor ovobe the carpot. rainwater cpllection system as required by the boa · 30 m away
- 3512 GreenwayAug 28, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton up flow single stage · 59 m away
- 3707 Hampton RdAug 6, 2024Installation of new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel · 88 m away
- 3701 Hampton RdDec 1, 2025New pool · 90 m away
- 3410 GreenwayDec 13, 2025Interior remodel - see attachments for full scope of work prewiring and fixtures 1 - flood light 1 - recess can in the front porch 2 - recess can back patio 2 - recess cans in the powder bath change foyer fixture to 4 - recess cans **adding level 2 ev charger to the remodel. revision: rewired all lights and change devices for receptacles · 115 m away
- 3704 GreenwayJun 27, 2022Norrell · 121 m away
- 719 Carolyn AveNov 19, 2024Replacement of complete existing central heat and air system with or without duct work · 141 m away
- 3404 Hampton RdMar 23, 2026New irrigation system installation · 141 m away
- 3507 Woodrow StJun 9, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system (upstairs) · 142 m away
- 832 E 37th StJun 12, 2025Access on right to gain access under the pier and beam foundation to replace entire cast -iron drain system · 149 m away
- 3501 Woodrow StNov 26, 2024Replacement of an existing water heater 3501 woodrow · 154 m away
- 3710 GreenwayApr 15, 2024Interior remodel: replace existing landing and stairs · 162 m away