3501 Speedway
Austin, TX 78705
Electrical panel replacement permitted at 3501 Speedway
A City of Austin permit filed June 10, 2024, covers replacing an existing electrical panel at 3501 Speedway because of a fire hazard from a burnt-out bus. A separate 2023 permit concerned restoring power to apartment 103 after a fire in another unit.
Summarized from City of Austin records · updated Jun 10, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jun 10, 2024
- since Jun 10, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsReplace existing panel with new panel due to extreme fire hazard of burnt out buss
Replace existing panel with new panel due to extreme fire hazard of burnt out buss
City of Austin permitElectrical PermitFinal- Record
- 2024-072914 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
**apartment complex- oasis 3501 speedway apt # 103 78705; need inspection for power to be turned on from a fire that is in a different unit
**apartment complex- oasis 3501 speedway apt # 103 78705; need inspection for power to be turned on from a fire that is in a different unit
City of Austin permitElectrical PermitFinal- Record
- 2023-090798 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3501 Speedway
What work is happening at 3501 Speedway?
A City of Austin electrical permit covers replacing an existing panel due to a fire hazard from a burnt-out bus. The permit, 2024-072914 EP, was filed June 10, 2024, and is marked final.
When was the electrical panel replacement permitted at 3501 Speedway?
The City of Austin filed permit 2024-072914 EP on June 10, 2024. It is marked final.
Is a new building being built at 3501 Speedway?
The records provided show electrical permits, not a new building permit. The 2024 permit describes replacing an existing electrical panel.
Was there a fire at 3501 Speedway?
A July 19, 2023, permit says an inspection was needed to restore power to apartment 103 after a fire in a different unit. It does not identify the unit where that fire occurred.
What electrical work is happening near 38th & Speedway?
At 3501 Speedway, about 59 meters from 38th & Speedway, a June 2024 permit covers replacing an existing panel due to a fire hazard from a burnt-out bus.
Also being built nearby
All of 78705- 110 E 37th StJul 22, 2026Repair on interior parts on meter for unit 108 · 38 m away
- 104 E 35th StNov 5, 2026Perform gas pressure test on both sides of a duplex building for the city to turn on the gas · 46 m away
- 3502 SpeedwayFeb 25, 2025Excavate a 15 yard line to replace all of the yard line between the house and the garage including the clean out · 50 m away
- 3701 Speedway · 38th & Speedway LPNov 2, 2026Monroe square retail — renovation/alteration — interior renovation of existing single family house to change use to general retail · 59 m away
- 3506 SpeedwayOct 14, 2026Replacing 4 windows like for like in existing residential space · 60 m away
- 3707 Speedway · 38th & Speedway LPNov 10, 2026Rockman dos — renovation/alteration — interior finish-out of a bakery and coffee shop · 67 m away
- 202 E 35th StAug 28, 2026Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 205 E 35th StMar 3, 2025Replacement of complete existing central heat and air system with or without duct work replace existing system with mitsubishi ductless heat pump · 111 m away
- 3504 Grooms StSep 30, 2025Express - foundation repair · 115 m away
- 3703 Cedar StSep 1, 2026Construct new walkway of 4.33 lf connecting from sidewalk to residence and new driveway approach of 12 ft. *** c&j foundations- insurance is going to expire on oct 1st 2026 · 120 m away
- 3608 Grooms StJun 3, 2025Relocation of 6 wastewater service · 121 m away
- 3704 Grooms StSep 30, 2026Retroactively permitting accessory use detached uncovered wood deck · 127 m away