408 W 34th St
Austin, TX 78705
408 W 34th St: 1 project on record
City of Austin lists 1 filing across 1 project at 408 W 34th St, Austin, TX 78705. The most recent, filed January 9, 2024, covers: “New construction in-ground pool”.
Compiled from City of Austin records · updated Jan 9, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 9, 2024
- since Jan 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredNew construction in-ground pool
- AppliedMar 31, 2022
- IssuedJan 9, 2024
- !WorkJan '24 – Jul '24
- Final inspection
Marked expired Jul 9, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectNew construction in-ground pool
New construction in-ground pool
City of Austin permitBuilding PermitExpired- Record
- 2022-115587 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 408 W 34th St
What is being built at 408 W 34th St?
The latest filing (City of Austin permit 2022-115587 BP, January 9, 2024) covers new construction in-ground pool.
How many permits and filings does 408 W 34th St have?
1 filing across 1 project, from January 9, 2024 to January 9, 2024.
Is there other construction near 408 W 34th St?
Yes. Nearby filings include 411 W 34th St (interior remodel: interior renovation to update all bathrooms and kitchen including replacement of surface materials such as drywall tile flooring cabinetry countertops paint trim lighting and plumbing fixtures. bedroom updates limited to flooring paint lighting and fixture replacement. (building 2-unit c), May 19, 2026); 501 W 34th St (replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork, Dec 9, 2025); 316 W 34th St (install 5.7kw rooftop solar system to existing residential adu only, Nov 3, 2026).
How do I get alerts for new permits at 408 W 34th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 411 W 34th StMay 19, 2026Interior remodel: interior renovation to update all bathrooms and kitchen including replacement of surface materials such as drywall tile flooring cabinetry countertops paint trim lighting and plumbing fixtures. bedroom updates limited to flooring paint lighting and fixture replacement. (building 2-unit c) · 54 m away
- 501 W 34th StDec 9, 2025Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork · 62 m away
- 316 W 34th StNov 3, 2026Install 5.7kw rooftop solar system to existing residential adu only · 74 m away
- 406 W 33rd StAug 22, 2024Pulled meter gas off to occupied property. replace approximately 50 of gas line on upstairs unit. (middle gas meter) · 75 m away
- 408 W 33rd StNov 18, 2026Interior remodel: interior renovation to update all bathrooms and kitchen including replacement of surface materials such as drywall tile flooring cabinetry countertops paint trim lighting and plumbing fixtures. bedroom updates limited to flooring paint lighting and fixture replacement. (building 1 unit a & b) · 77 m away
- 500 W 33rd StOct 24, 2025Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork · 87 m away
- 314 W 34th StSep 26, 2024Construct new driveway approach of 19.8 ft. driveway approach is from the alley · 89 m away
- 315 W 35th StAug 19, 2025Gas pressure test · 103 m away
- 3423 Guadalupe StMar 2, 20073423 guadalupe · 115 m away
- 404 W 35th StApr 23, 2024Replace gas line from meter to building · 116 m away
- 508 W 33rd StNov 21, 2023(kalyanasundharam jairam) - installation of circuit for elec. vehicle charging station - esip) · 117 m away
- 212 W 33rd StJun 4, 2025Express: foundation repair · 125 m away
More pools in 78705.