508 Bellevue Pl
Austin, TX 78705
508 Bellevue Pl: 2 projects on record
City of Austin lists 2 filings across 2 projects at 508 Bellevue Pl, Austin, TX 78705 since May 29, 2024. The most recent, filed November 11, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Nov 11, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Nov 11, 2024
- since May 29, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedOct 24, 2024
- IssuedNov 11, 2024
- !WorkNov '24 – May '25
- Final inspection
Marked expired May 11, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2024-143315 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Foundation repair on the existing single family residence
Foundation repair on the existing single family residence
City of Austin permitBuilding PermitFinal- Record
- 2010-031833 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 508 Bellevue Pl
What is being built at 508 Bellevue Pl?
The latest filing (City of Austin permit 2024-143315 MP, November 11, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 508 Bellevue Pl have?
2 filings across 2 projects, from May 29, 2024 to November 11, 2024.
Is there other construction near 508 Bellevue Pl?
Yes. Nearby filings include 506 Bellevue Pl (replacement of an existing water heater, Nov 15, 2023); 604 Bellevue Pl (replace cast iron drain lines under pier and beam home includes 2 full bathrooms kitchen and washer drain line. replace sewer line from home to city tap trench length approximately 50 feet, Oct 2, 2024); 509 Rathervue Pl (replacement of complete existing central heat and air system with or without duct work, Sep 21, 2026).
How do I get alerts for new permits at 508 Bellevue Pl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 506 Bellevue PlNov 15, 2023Replacement of an existing water heater · 17 m away
- 604 Bellevue PlOct 2, 2024Replace cast iron drain lines under pier and beam home includes 2 full bathrooms kitchen and washer drain line. replace sewer line from home to city tap trench length approximately 50 feet · 42 m away
- 509 Rathervue PlSep 21, 2026Replacement of complete existing central heat and air system with or without duct work · 45 m away
- 601 Rathervue PlDec 4, 2025Main breaker failure · 49 m away
- 511 Bellevue PlMay 5, 2025Existing non conforming duplex - 1 for 1 replacement of exterior stairs for access to 2nd floor unit · 54 m away
- 505 Rathervue PlJun 25, 2025Remove gas piping for previously removed appliances and run new gas line to attic of residence for future appliance · 60 m away
- 605 Rathervue PlJul 30, 2025Relocating meter to service rack trenching to subpanel attached to structure · 63 m away
- 3007 Duval StJun 10, 2026Update main breaker from a 60 to a 100 no meter work required · 78 m away
- 505 Bellevue PlJul 10, 2024Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 2907 Duval StAug 7, 2025Due to strom-remove and replace existing service. damage beyond repair. no interior loads have been applied. please see attached espa · 87 m away
- 602 Elmwood PlNov 21, 2024Replace the hvac unit · 110 m away
- 609 Bellevue PlDec 5, 2024Repair ~6 of gas line · 112 m away
More new homes in 78705.