310 Inner Campus Drive B7500
Austin, TX 78712 · The University Of Texas At Austin
Goldsmith Hall west patio and ramp repairs at UT Austin
Repairs to Goldsmith Hall’s west patio and ramp were registered with TDLR on May 13, 2025. The 3,200-square-foot project includes removing and replacing waterproofing and replacing the existing ramp. The applicant’s estimated project cost is $1.2 million.
Summarized from Texas Department of Licensing and Regulation records · updated May 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 13, 2025
- since May 13, 2025
- Largest scope
- 3,200 sf
- Estimated cost
- $1.2M
- state registration
Where this project stands
Inspected · closing outGoldsmith Hall West Patio Repairs
3,200 sq ft · $1.2M est.
- RegisteredMay 13, 2025
- Plan review
- ConstructionJun '25 – Jan '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectDemolition existing waterproofing, install new waterproofing. demolition existing ramp, install new ramp. — goldsmith hall
TDLR project registrationRenovation/AlterationInspection Complete3,200 sq ft$1.2M est.- Project #
- TABS2025018878
- Tenant / owner
- Goldsmith Hall West Patio Repairs
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 310 Inner Campus Drive B7500
What is being built at 310 Inner Campus Drive in Austin?
A repair project at Goldsmith Hall will replace the west patio’s waterproofing and the existing ramp. It was registered with TDLR on May 13, 2025.
What repairs are planned for Goldsmith Hall?
The scope calls for demolishing the existing waterproofing and installing new waterproofing, as well as demolishing and replacing the existing ramp. The TDLR registration describes it as a renovation or alteration.
How much will the Goldsmith Hall west patio repairs cost?
The applicant estimated the project cost at $1.2 million in the TDLR registration. This is an estimate, not a confirmed final cost.
How large is the Goldsmith Hall repair project?
The TDLR registration lists the project at 3,200 square feet.
When was the Goldsmith Hall repair project filed?
The project was registered with the Texas Department of Licensing and Regulation on May 13, 2025. Its registration number is TABS2025018878.
What is happening near the University of Texas at Austin on Inner Campus Drive?
Goldsmith Hall’s west patio and ramp are scheduled for repairs, including new waterproofing and a replacement ramp. The project is at 310 Inner Campus Drive on the University of Texas at Austin campus.
Also being built nearby
All of 78712- 310 Inner Campus Dr · The University Of Texas At AustinMar 5, 2026Gol - classrooms refresh — renovation/alteration — refreshing (3) classrooms totaling 7,336 sq ft with new paint, ceiling tiles/grid, light fixtures, power receptacles, and refinishing the wood floors and baseboards
- 306 Inner Campus Drive · The University Of TexasFeb 26, 202423017.01 - ut document solutions — renovation/alteration — interior remodel with demolition of walls and finishes, construction of new electrical walls, doors, mep systems and finishes, new/relocated equipment and furntiure · 3 m away
- 302 Inner Campus Drive · University Of Texas At AustinMay 13, 2025Ut battle hall - repairs for reopening — renovation/alteration — 37,000sf · 6 m away
- 128 Inner Campus Dr · University Of Texas At AustinAug 15, 2025Ada-tdlr - inner campus drive — renovation/alteration — renovate 7,893 s.f. of roadway: the project is to correct non-compliances to the accessible path from the south mall steps and ramp east along inner campus drive to the rear of wagner hall. the major problems to resolve are as follows: · 8 m away
- 2222 Speedway · The University Of Texas At AustinJan 20, 2025Ut brb advising offices — renovation/alteration — build out of 5 advising offices within suite 1.114 in the brb building. project includes all new finishes, ceiling, lighting, mechanical adjustments, etc · 90 m away
- 2225 Speedway · The University Of Texas At AustinApr 21, 2025Brb front office renovation — renovation/alteration — project comprises the renovation of an existing reception and lobby space. new work will provide a new ada compliant reception area as well as a new office with updated finishes and lighting · 94 m away
- 2305 Speedway · The University Of Texas At AustinJul 24, 2026Jgb - alessi lab renovation 5.112 — renovation/alteration — wet lab renovation (700 sq ft) including demolition of counters, case work, and lab benches, new flooring, paint, and ceiling tiles, mep upgrades · 119 m away
- 110 Inner Campus Drive · The University Of Texas At AustinSep 1, 2026Mai: 101 renovation — renovation/alteration — renovation of main suite 101 to serve as the temporary president's office during the main building restoration. scope includes interior finish upgrades, lighting, power/data/av, security systems, restroom · 123 m away
- 2317 Speedway · The University Of Texas At AustinMay 19, 2025Ut gdc: office renovations — renovation/alteration — project comprises the renovation of an existing lab space on level 1. new work will create a new storage room and computer lab within the existing research lab area · 131 m away
- 105 E 24th St, Austin, TX 78712 · University Of Texas AustinMay 29, 2025Ut austin welch hall — renovation/alteration — renovation of existing building, levels 1 &5 with new classroom, laboratories, and write-up spaces · 214 m away
- 105 E 24th St · University Of Texas At AustinJul 9, 2025Marty lab renovation — renovation/alteration — interior renovation and finish out of existing lab space in welch hall. project scope includes architectural and mep improvements to support an analytical and biochemistry lab. total project area is ~ 700 sq ft · 214 m away
- 103 W 24th Street · The University Of Texas At AustinDec 9, 2025Pai: pai tip scholars — renovation/alteration — the project comprises the renovation of an existing suite and conference room including fishes and adding a doorway from one suite to another. the project also includes the renovation of an existing lab to a breakroom · 217 m away
More demolitions in 78712.