10513 W Parmer Ln
Austin, TX 78717
Two-story office building planned for dental-office use
Austin permits indicate a two-story, approximately 4,062-square-foot office shell at 10513 W Parmer Ln, with permits for a dental-office interior remodel filed from July 23 to August 6, 2024. A 2025 electrical permit also describes the shell building, and a later plumbing permit covers a fireline and hydrant serving the office building.
Summarized from City of Austin records · updated Apr 21, 2025
- Projects
- 16
- 16 filings
- Latest filing
- Apr 21, 2025
- since Dec 12, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledFireline only -installing a 8 dcda and fire hydrant that will feed office builidng. sp-2019-0402c (2021-001465 bp)
- AppliedJun 23, 2020
- IssuedApr 21, 2025
- WorkApr '25 – Apr '25
- Final inspectionApr 29, 2025
Passed final inspection Apr 29, 2025.
Permit & project history
16 projectsFireline only -installing a 8 dcda and fire hydrant that will feed office builidng. sp-2019-0402c (2021-001465 bp)
Fireline only -installing a 8 dcda and fire hydrant that will feed office builidng. sp-2019-0402c (2021-001465 bp)
City of Austin permitPlumbing PermitFinal- Record
- 2025-047813 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installing 4-zone hunter controller 6 station
Installing 4-zone hunter controller 6 station
City of Austin permitPlumbing PermitFinal- Record
- 2025-029072 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
2 story office shell building on a 0.5 acre lot for approx 4062 sq ft
2 story office shell building on a 0.5 acre lot for approx 4062 sq ft
City of Austin permitElectrical PermitFinal- Record
- 2021-001465 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Atx braces tenant monument
Atx braces tenant monument
City of Austin permitElectrical PermitFinal- Record
- 2024-125350 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use - shell to dental office interior remodel. [7 day review]
Change of use - shell to dental office interior remodel. [7 day review]
City of Austin permitElectrical PermitFinal- Record
- 2024-084894 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior finish out design of an approx. 2002sft office on level 2 in an existing 4062sft 2-story new shell building
Interior finish out design of an approx. 2002sft office on level 2 in an existing 4062sft 2-story new shell building
City of Austin permitBuilding PermitExpired- Record
- 2024-102080 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Atx braces east elevation
Atx braces east elevation
City of Austin permitElectrical PermitFinal- Record
- 2024-099071 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Atx braces north elevation
Atx braces north elevation
City of Austin permitElectrical PermitFinal- Record
- 2024-099056 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use - shell to dental office interior remodel. [7 day review]
Change of use - shell to dental office interior remodel. [7 day review]
City of Austin permitPlumbing PermitFinal- Record
- 2024-084894 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use - shell to dental office interior remodel. [7 day review]
Change of use - shell to dental office interior remodel. [7 day review]
City of Austin permitPlumbing PermitFinal- Record
- 2024-084895 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use - shell to dental office interior remodel. [7 day review]
Change of use - shell to dental office interior remodel. [7 day review]
City of Austin permitMechanical PermitFinal- Record
- 2024-084894 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use - shell to dental office interior remodel. [7 day review] 10-11-2024 shell permit not closed sp-2019-0402c unpaid ev fee. michael bogard 512-605-9705
Change of use - shell to dental office interior remodel. [7 day review] 10-11-2024 shell permit not closed sp-2019-0402c unpaid ev fee. michael bogard 512-605-9705
City of Austin permitBuilding PermitFinal- Record
- 2024-084894 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel to existing mcdonalds
Interior remodel to existing mcdonalds
City of Austin permitMechanical PermitFinal- Record
- 2023-157192 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel to existing mcdonalds
Interior remodel to existing mcdonalds
City of Austin permitElectrical PermitFinal- Record
- 2023-157192 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel to existing mcdonalds
Interior remodel to existing mcdonalds
City of Austin permitPlumbing PermitFinal- Record
- 2023-157192 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel to existing mcdonalds
Interior remodel to existing mcdonalds
City of Austin permitBuilding PermitFinal- Record
- 2023-157192 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10513 W Parmer Ln
What is being built at 10513 W Parmer Ln?
City of Austin permits describe a two-story office shell of approximately 4,062 square feet and an interior remodel to change the shell to a dental office. The dental-office permits were filed in July and August 2024.
Is a dental office planned at 10513 W Parmer Ln in Austin?
Permits filed in 2024 describe a change of use from office shell to dental-office interior remodel. The records do not identify a dental practice or tenant.
How large is the office building at 10513 W Parmer Ln?
A City of Austin permit description calls it a two-story office shell of approximately 4,062 square feet on a 0.5-acre lot.
When were permits filed for the dental-office remodel at 10513 W Parmer Ln?
The building permit 2024-084894 BP was filed July 23, 2024. Related mechanical, plumbing and electrical permits were filed July 30 and August 6, 2024.
What is the latest work permitted at 10513 W Parmer Ln?
A plumbing permit filed April 21, 2025, describes installation of a fireline and hydrant to serve the office building. Permit 2025-047813 PP is listed as final.
Also being built nearby
All of 78717- 10510 W Parmer LnMay 21, 2024Remodel interior finish out/ mechanical/ plumbing/ electrical/ sprinkler heads under 20 heads to existing personal services · 14 m away
- 10510 W Parmer Lane · Wsp Development LtdFeb 14, 2024Blo blow dry bar — renovation/alteration — remodel of existing space, finish out · 14 m away
- 10521 Parmer Ln · Aava Enterprises LLCMay 2, 2024Dental office - dr. brenner — renovation/alteration — interior build-out · 18 m away
- 10526 W Parmer LnSep 18, 2025Change of use from office to personal services (med spa) with remodel · 33 m away
- 10510 Parmer LnDec 19, 2007Avery ranch commercial southeast, resubdivision of lot 1, block a — avery ranch commercial southeast, resubdivision of lot 1, block a · 67 m away
- 10513 Parmer LnMay 30, 2025Reddy's office · 89 m away
- 10525 Parmer LnApr 24, 2007Avery ranch commercial southwest — avery ranch commercial southwest · 102 m away
- 10526 Parmer LnJun 16, 2015Avery ranch commercial southeast · 137 m away
- 15100 Terra Verde DrAug 11, 2025Replacement of an existing water heater · 179 m away
- 15019 Terra Verde DrMar 4, 2026Add a roof above the existing slab in the back yard. the roof area will be larger than the current slab area. due to the heritage trees in the backyard the arbor suggested that we use a diamond pier for the two pillars. this diamond pier will be two feet from the end of the existing slab. shingled roof · 189 m away
- 14951 Avery Ranch BlvdFeb 18, 2026Demolition of approx. 30 linear feet of non-load bearing wall and build approx. 30 linear of new wall paint new flooring cabinet modifications change existing light fixtures · 198 m away
- 15023 Savannah Heights DrJan 28, 2009Davis spring sec 3-d, amended plat of — davis spring subdivision section 3-d amended plat of · 215 m away