10900-1/2 Staked Plains Dr
Austin, TX 78717
10900-1/2 Staked Plains Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 10900-1/2 Staked Plains Dr, Austin, TX 78717 since June 9, 2011. The most recent, filed September 24, 2013, covers: “Avery station cluster 1, stage 2”.
Compiled from City of Austin records · updated Sep 24, 2013
- Projects
- 2
- 2 filings
- Latest filing
- Sep 24, 2013
- since Jun 9, 2011
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 10900-1/2 Staked Plains Dr
What is being built at 10900-1/2 Staked Plains Dr?
The latest filing (City of Austin case 10524904, September 24, 2013) covers avery station cluster 1, stage 2.
How many permits and filings does 10900-1/2 Staked Plains Dr have?
2 filings across 2 projects, from June 9, 2011 to September 24, 2013.
Is there other construction near 10900-1/2 Staked Plains Dr?
Yes. Nearby filings include 11001 Strasburg Ln (battery only installation & upgrade main service panel to 200a rated bus with 200a main breaker, May 31, 2024); 11005 Strasburg Ln (we will be replacing the prv, Oct 30, 2025); 11000 Strasburg Ln (remove and replace gateway. pec, Aug 7, 2026).
How do I get alerts for new permits at 10900-1/2 Staked Plains Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78717- 11001 Strasburg LnMay 31, 2024Battery only installation & upgrade main service panel to 200a rated bus with 200a main breaker · 75 m away
- 11005 Strasburg LnOct 30, 2025We will be replacing the prv · 82 m away
- 11000 Strasburg LnAug 7, 2026Remove and replace gateway. pec · 97 m away
- 10616 Wills LoopNov 5, 2026Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 10612 Wills LoopJul 18, 2025Replace panel guts and install new breakers for outdoor main panel. the bottom of the panel guts were melted due to a tesla charger breaker · 143 m away
- 10634 Wills LoopFeb 17, 2025Replacement of complete existing central heat and air system with or without duct work replace 2 ton gas system with new mid standard goodman. new gsxh5 condenser and gm9s air handler on puron refrigerant. remove and dispose of old equipment. new ecobee3 wifi thermostat · 162 m away
- 10508 Larue PassOct 26, 2026Replacement of tankless water heater like for like · 165 m away
- 14017 Tyburn TrlJan 16, 2025Replaced water heater and prv in yard · 174 m away
- 13900 Tyburn TrlOct 27, 2025Replacement of an existing water heater replace two existing noritz tankless water heaters with navien tankless water heaters in garage · 186 m away
- 10659 Wills LoopMay 21, 2026Replacement of an existing water heater navien 180s2 tankless water heater change out 10659 wills loop austin tx 78717 · 187 m away
- 14016 Tyburn TrlAug 12, 2026Installation of a new residential roof-mounted solar photovoltaic system with battery energy storage at 14016 tyburn trl austin tx 78717. the electric utility provider is pedernales electric cooperative. work includes pv modules mounting equipment inverter/microinverters battery energy-storage equipment disconnects conduit wiring rapid shutdown labeling and utility-interconnection equipment in accordance with the approved plans manufacturer specifications and applicable codes. this is a new installation · 214 m away
- 10525 Staked Plains DrApr 14, 2015Avery station cluster iii · 222 m away