14100 Tyburn Trl: 1 project on record
City of Austin lists 1 filing across 1 project at 14100 Tyburn Trl, Austin, TX 78717. The most recent, filed March 14, 2025, covers: “Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new emt conduit to power the level 2 ev charger at 48amp constant draw”.
Compiled from City of Austin records · updated Mar 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 14, 2025
- since Mar 14, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledLevel 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new emt conduit to power the level 2 ev charger at 48amp constant draw
- AppliedDec 3, 2024
- IssuedMar 14, 2025
- WorkMar '25 – Mar '25
- Final inspectionMar 20, 2025
Passed final inspection Mar 20, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectLevel 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new emt conduit to power the level 2 ev charger at 48amp constant draw
Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new emt conduit to power the level 2 ev charger at 48amp constant draw
City of Austin permitElectrical PermitFinal- Record
- 2024-157996 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 14100 Tyburn Trl
What is being built at 14100 Tyburn Trl?
The latest filing (City of Austin permit 2024-157996 EP, March 14, 2025) covers level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new emt conduit to power the level 2 ev charger at 48amp constant draw.
How many permits and filings does 14100 Tyburn Trl have?
1 filing across 1 project, from March 14, 2025 to March 14, 2025.
Is there other construction near 14100 Tyburn Trl?
Yes. Nearby filings include 14016 Tyburn Trl (installation of a new residential roof-mounted solar photovoltaic system with battery energy storage at 14016 tyburn trl austin tx 78717. the electric utility provider is pedernales electric cooperative. work includes pv modules mounting equipment inverter/microinverters battery energy-storage equipment disconnects conduit wiring rapid shutdown labeling and utility-interconnection equipment in accordance with the approved plans manufacturer specifications and applicable codes. this is a new installation, Aug 12, 2026); 14017 Tyburn Trl (replaced water heater and prv in yard, Jan 16, 2025); 14000 Laurinburg Dr (replacement of condenser only, Jul 15, 2024).
How do I get alerts for new permits at 14100 Tyburn Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78717- 14016 Tyburn TrlAug 12, 2026Installation of a new residential roof-mounted solar photovoltaic system with battery energy storage at 14016 tyburn trl austin tx 78717. the electric utility provider is pedernales electric cooperative. work includes pv modules mounting equipment inverter/microinverters battery energy-storage equipment disconnects conduit wiring rapid shutdown labeling and utility-interconnection equipment in accordance with the approved plans manufacturer specifications and applicable codes. this is a new installation · 46 m away
- 14017 Tyburn TrlJan 16, 2025Replaced water heater and prv in yard · 64 m away
- 14000 Laurinburg DrJul 15, 2024Replacement of condenser only · 73 m away
- 10805 Canton Jack RdSep 21, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 117 m away
- 14212 Tyburn TrlMar 5, 2026Replacement of an existing water heater · 142 m away
- 11000 Strasburg LnAug 7, 2026Remove and replace gateway. pec · 144 m away
- 10900 Canton Jack RdSep 13, 2024Installation of level hardwire 60amp ev charger. wire run consisting of seu 4 wire will go from the outside panel go up through conduit to the attic go across to the garage charger location will come down inside the wall where it will go into a non-fusible disconnect and complete the run using thhn 6 wire · 149 m away
- 14213 Tyburn TrlFeb 17, 2025Replacement of complete existing central heat and air system with or without duct work replacing zoned 4 ton straight cool condenser + horizontal furnace & coil located in upstairs attic with pull down ladder with new 4 ton r454b variable speed duel fuel premiere 18 heat pump condenser + s8v2 furnace & 009 coil · 157 m away
- 11005 Strasburg LnOct 30, 2025We will be replacing the prv · 159 m away
- 11001 Strasburg LnMay 31, 2024Battery only installation & upgrade main service panel to 200a rated bus with 200a main breaker · 162 m away
- 13900 Tyburn TrlOct 27, 2025Replacement of an existing water heater replace two existing noritz tankless water heaters with navien tankless water heaters in garage · 172 m away
- 10809 Crosbyton LnJul 13, 2026Installing outlet for water heater · 197 m away