15304 Whistling Straits Dr
Austin, TX 78717
Permit filed for EV charger circuit at 15304 Whistling Straits Dr
An electrical permit indicates work for an EV charger at 15304 Whistling Straits Dr: installing a new 60-amp circuit in the existing 125-amp main service panel. The City of Austin permit was filed on November 5, 2026, and is listed as active.
Summarized from City of Austin records · updated Nov 5, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 5, 2026
- since Nov 5, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayEv charger install: install a new 60a circuit in the 125a main service panel
- AppliedOct 29, 2026
- IssuedNov 5, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectEv charger install: install a new 60a circuit in the 125a main service panel
Ev charger install: install a new 60a circuit in the 125a main service panel
City of Austin permitElectrical PermitActive- Record
- 2026-143457 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 15304 Whistling Straits Dr
What is being installed at 15304 Whistling Straits Dr?
A City of Austin permit indicates a new 60-amp circuit is being installed in the existing 125-amp main service panel for an EV charger. The permit was filed November 5, 2026.
Is there an EV charger permit for 15304 Whistling Straits Dr in Austin?
Yes. City of Austin permit 2026-143457 EP is for electrical work described as an EV charger installation.
When was the EV charger work permitted at 15304 Whistling Straits Dr?
The City of Austin filed permit 2026-143457 EP on November 5, 2026. It is listed as active.
What size circuit is planned for the EV charger at 15304 Whistling Straits Dr?
The permit description specifies a new 60-amp circuit in the existing 125-amp main service panel.
Is a new home being built at 15304 Whistling Straits Dr?
The record provided is for an electrical permit, not a new-home construction permit. It describes work for an EV charger circuit.
Also being built nearby
All of 78717- 10113 Valderrama DrAug 14, 2024(tong tesla kim yaw) - nstallation of ev charger bi-directional capable -esip · 67 m away
- 10108 Morgan Creek DrJun 3, 2025Gas tankless water heater and a pressure reducing valve · 68 m away
- 15309 Morgan Creek CtApr 16, 2026Replacement of an existing water heater · 109 m away
- 15321 Morgan Creek CtJun 10, 2024Install evse · 123 m away
- 15400 Whistling Straits DrMar 2, 2007Avery south section one, phase one, lots 2-10, block "i" — avery south section one, phase one, lots 2-10, block "i · 134 m away
- 10121 Morgan Creek DrOct 27, 2026Replacement of complete existing central heat and air system with or without duct work · 167 m away
- 15127 Thatcher DrAug 25, 2026Install level 2 ev charger. charger to be hardwired to 60a breaker placed inside main electric panel on exterior left wall of home. charger to be mounted to pedestal. includes short trench through the mulch near front of driveway · 168 m away
- 15312 Morgan Creek CtJan 6, 2025Replacement of an existing water heater · 177 m away
- 15215 Thatcher DrApr 21, 2026Upgrade underground 150a service to a 200a service · 178 m away
- 15408 Fisher Island DrOct 22, 2025Repair and replace existing wooden deck(12 by 16ft) with composite deck in and extend by 7ft. the builder will install new concrete footings to meet trex specs 4x6 support post and attached to footings with metal post bases.contractor to install double 2x10 beam and attached to 4x6 post. contractor to install 2x8 ledger and bolted to home foundation with 1/2 wedge anchors every 24. joist to be 2x8 at 16o.c. and attached to ledger with metal joist hangers and attach to beam the hurricane ties. all decking to be attached with camo hidden fasteners. contractor to install a 4x4 landing with steps and 36 tall black metal railing with 5 1/2 ipe hand rail · 190 m away
- 15223 Thatcher DrJan 14, 2026New pool with required enclosure and concrete deck · 215 m away
- 15120 Thatcher DrMay 22, 2024Install level 2 ev charger per austin energys plug-in rebate guidelines · 219 m away