15609 Royal Dublin Dr
Austin, TX 78717
15609 Royal Dublin Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 15609 Royal Dublin Dr, Austin, TX 78717. The most recent, filed November 29, 2023, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Nov 29, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 29, 2023
- since Nov 29, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedNov 28, 2023
- IssuedNov 29, 2023
- WorkNov '23 – Jan '24
- Final inspectionJan 11, 2024
Passed final inspection Jan 11, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2023-152712 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 15609 Royal Dublin Dr
What is being built at 15609 Royal Dublin Dr?
The latest filing (City of Austin permit 2023-152712 PP, November 29, 2023) covers replacement of an existing water heater.
How many permits and filings does 15609 Royal Dublin Dr have?
1 filing across 1 project, from November 29, 2023 to November 29, 2023.
Is there other construction near 15609 Royal Dublin Dr?
Yes. Nearby filings include 15613 Royal Dublin Dr (enclose existing back porch, Nov 3, 2026); 9600 Pasatiempo Dr (level 2 ev charger powered by a 50amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <40 feet new 3/4 emt conduit to power the level 2 ev charger at 40amp constant draw, Jul 22, 2026); 9604 Castle Pines Dr (replacement of an existing water heater, Aug 26, 2024).
How do I get alerts for new permits at 15609 Royal Dublin Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78717- 15613 Royal Dublin DrNov 3, 2026Enclose existing back porch · 19 m away
- 9600 Pasatiempo DrJul 22, 2026Level 2 ev charger powered by a 50amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <40 feet new 3/4 emt conduit to power the level 2 ev charger at 40amp constant draw · 42 m away
- 9604 Castle Pines DrAug 26, 2024Replacement of an existing water heater · 95 m away
- 9528 Castle Pines DrApr 17, 2024Replacement of complete existing central heat and air system with or without duct work · 117 m away
- 9704 Morgan Creek DrMay 20, 2024Replacement of complete existing central heat and air system with or without duct work · 125 m away
- 15712 Edenderry DrMay 15, 2026Replacement of complete existing central heat and air system with or without duct work remove existing furnace and replace with a goodman - remove both plenums and install new plenums - remove all existing duct work for the downstairs unit - redesign new duct work lay out and replace install · 126 m away
- 15716 Edenderry DrMay 30, 2025Express: replacing 9 windows · 139 m away
- 9716 Castle Pines DrNov 26, 2024Replacement of complete existing central heat and air system with or without duct work · 143 m away
- 9521 Castle Pines DrSep 9, 2025Install evse · 159 m away
- 9516 Castle Pines DrNov 19, 2025Replacement of complete existing central heat and air system with or without duct work · 161 m away
- 9608 Morgan Creek DrMay 20, 2025Express: replace existing tub/shower with acrylic base and walls. replace fixture and valve · 164 m away
- 9725 Castle Pines DrFeb 23, 2024Replacement of complete existing central heat and air system with or without duct work · 166 m away