Covered patio addition permitted at 9100 Finley Mae Way
Austin permits indicate a new covered patio addition at 9100 Finley Mae Way. The building permit, 2026-097144 BP, was filed August 21, 2026, and the electrical permit, 2026-097144 EP, followed August 28; both are marked final. A separate gas line test permit was filed May 5, 2026.
Summarized from City of Austin records · updated Aug 28, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Aug 28, 2026
- since May 5, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledAddition- construction of new covered patio
- AppliedJun 23, 2026
- IssuedAug 28, 2026
- WorkAug '26 – Nov '26
- Final inspectionNov 6, 2026
Passed final inspection Nov 6, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsAddition- construction of new covered patio
Addition- construction of new covered patio
City of Austin permitElectrical PermitFinal- Record
- 2026-097144 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Addition- construction of new covered patio
Addition- construction of new covered patio
City of Austin permitBuilding PermitFinal- Record
- 2026-097144 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Gas line test
Gas line test
City of Austin permitPlumbing PermitFinal- Record
- 2026-055028 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9100 Finley Mae Way
What is being built at 9100 Finley Mae Way?
Austin permits describe construction of a new covered patio addition. The building and electrical permits are both marked final.
When was the covered patio permitted at 9100 Finley Mae Way?
The building permit was filed August 21, 2026, and the electrical permit was filed August 28, 2026.
What are the permit numbers for 9100 Finley Mae Way?
The covered patio permits are 2026-097144 BP for building and 2026-097144 EP for electrical work. Both are marked final.
Was a gas line permit filed at 9100 Finley Mae Way?
Yes. A plumbing permit for a gas line test, 2026-055028 PP, was filed May 5, 2026, and is marked final.
Is a new home being built at 9100 Finley Mae Way?
The listed permits describe a covered patio addition and a gas line test, not construction of a new home.
Also being built nearby
All of 78717- 16325 Donoher DrJan 8, 2026Replacement of mini-split system mini split system was installed · 59 m away
- 16329 Donoher DrJun 29, 2026We are moving a as line and a hose bib that was found during the demolition/remodel of the current permitted work. this is the current building permit 2026-048056 bp · 60 m away
- 16401 Donoher DrSep 17, 2025Installing a solar system in a non austin energy serviced area (territory grid serviced by pedernales coop - pec) but still belonging to the city of austin territory · 110 m away
- 16320 Donoher DrJun 24, 2025Install level 2 ev charger · 111 m away
- 9020 Rattlesnake TrlOct 21, 2026Porch enclosure- enclose second story balcony and first story porch (stacked) into sunrooms. glass windows and doors with thermal break aluminum framing. a 1 ton daikin mini-split installed for each space · 122 m away
- 9016 Rattlesnake TrlJun 10, 2025New inground pool concrete deck and equipment pad · 135 m away
- 16312 Horse Trap LnFeb 14, 2024New inground pool with spa & concrete deck · 138 m away
- 16404 Donoher DrAug 15, 2025Install level 2 ev charger · 144 m away
- 9101 Rattlesnake TrlMay 19, 2025New pool · 144 m away
- 9037 Rattlesnake TrlNov 3, 2025Install new 8.500 kw rooftop solar system and 13.5 kw energy storage system for existing residential only · 146 m away
- 9029 Rattlesnake TrlSep 22, 2025Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 151 m away
- 9008 Harper Rae DrJan 18, 2024Install evse at garage · 199 m away