9400 Neenah Ave
Austin, TX 78717
Holy Family Catholic School Phase 2 site plan approved
City of Austin records show a Phase 2 project for Holy Family Catholic School at 9400 Neenah Ave. Its site plan, case 11826971, was approved and released on January 21, 2022. The records do not list a project size or cost.
Summarized from City of Austin records · updated Jan 21, 2022
- Projects
- 6
- 6 filings
- Latest filing
- Jan 21, 2022
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsSources: City of Austin
Questions about 9400 Neenah Ave
What is being built at 9400 Neenah Ave in Austin?
City records list a Phase 2 project for Holy Family Catholic School. The site plan does not specify the project’s buildings or other details.
Was a permit approved for Holy Family Catholic School Phase 2?
The City of Austin approved and released site plan case 11826971 on January 21, 2022.
When was the Holy Family Catholic School Phase 2 plan filed?
The City of Austin case is dated January 21, 2022, and its status is Approved and Released.
How large is the Holy Family Catholic School Phase 2 project?
The available City of Austin record does not list a square footage for the project.
How much will Holy Family Catholic School Phase 2 cost?
The available records do not provide a project cost.
Are there earlier school plans at 9400 Neenah Ave?
Yes. City records include a Holy Family Catholic School site plan from 2007 and a St. Dominic Savio High School site plan from 2008. The 2007 Holy Family case was approved and released, while a separate 2007 case was withdrawn.
Also being built nearby
All of 78717- 15013 Solera DrDec 14, 2023Replacement of complete existing central heat and air system with or without duct work · 146 m away
- 9300 Neenah AveJul 2, 2026Addition of athletic lighting and electrical wiring at existing facilities · 147 m away
- 15009 Solera DrOct 16, 2024New irrigation system · 168 m away
- 14916 Solera DrNov 5, 2026Replacement of complete existing central heat and air system with or without duct work downstairs system only · 176 m away
- 14904 Solera DrMay 26, 2026Replacement of complete existing central heat and air system with or without duct work · 177 m away
- 9500 Neenah AveFeb 15, 2023St. vincent de paul catholic church · 236 m away
- 14836 Irondale DrJun 4, 2024Replacement of complete existing central heat and air system with or without duct work · 259 m away
- 9428 Altona WayNov 2, 2026Replacement of complete existing central heat and air system with or without duct work · 290 m away
- 9325 Castle Pines DrJun 8, 2026Replacement of complete existing central heat and air system with or without duct work · 330 m away
- 14825 Irondale DrJan 3, 2025Replacement of an existing water heater · 344 m away
- 9439 Altona WayDec 19, 2023Replacement of an existing water heater · 362 m away
- 14812 Irondale DrMay 11, 2026Express- replace 2 windows like for like in existing residential home. left side only · 367 m away