9819 Betulla Dr
Austin, TX 78717
Solar and energy storage components to be tied in
An electrical permit at 9819 Betulla Dr covers disconnecting and reconnecting service to tie in photovoltaic and energy storage components. The City of Austin issued the active permit, 2026-148177 EP, on November 13, 2026; the description says the service and meter sizes are not being upgraded.
Summarized from City of Austin records · updated Nov 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 13, 2026
- since Nov 13, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayDisconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size
- AppliedNov 10, 2026
- IssuedNov 13, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectDisconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size
Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size
City of Austin permitElectrical PermitActive- Record
- 2026-148177 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9819 Betulla Dr
What is being built at 9819 Betulla Dr?
A City of Austin electrical permit indicates work to tie in photovoltaic (solar) and energy storage components. The permit description says the service and meter sizes are not being upgraded.
What work does permit 2026-148177 EP cover?
The permit covers disconnecting and reconnecting service to tie in PV and energy storage components. It was issued November 13, 2026.
Is solar being installed at 9819 Betulla Dr?
The permit is categorized as a solar install and describes tying in PV components. It does not specify the system size or say whether the panels are rooftop-mounted.
When was the permit filed for 9819 Betulla Dr?
The City of Austin permit, 2026-148177 EP, was filed November 13, 2026, and is listed as active.
Is the electrical service being upgraded at 9819 Betulla Dr?
No service-size or meter-size upgrade is described. The permit says the work is to disconnect and reconnect service for the PV and energy storage tie-in.
What is being permitted near AT&T - MDL5 on Spectrum Drive?
At 9819 Betulla Dr, about 321 meters from AT&T - MDL5 at 9825 Spectrum Drive, an active electrical permit covers tying in PV and energy storage components. The permit was issued November 13, 2026.