9916 Bundoran Dr
Austin, TX 78717
Austin home gets central heating and air system replacement
City of Austin records show a replacement of the existing central heating and air system at 9916 Bundoran Dr. The mechanical permit was filed June 8, 2026, and is marked final. Earlier permits include a water heater replacement filed May 14, 2025.
Summarized from City of Austin records · updated Jun 8, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jun 8, 2026
- since May 14, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work 4ton 2stage gas system replacement
- AppliedMay 27, 2026
- IssuedJun 8, 2026
- WorkJun '26 – Jun '26
- Final inspectionJun 11, 2026
Passed final inspection Jun 11, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsReplacement of complete existing central heat and air system with or without duct work 4ton 2stage gas system replacement
Replacement of complete existing central heat and air system with or without duct work 4ton 2stage gas system replacement
City of Austin permitMechanical PermitFinal- Record
- 2026-066734 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Water heater replacement
Water heater replacement
City of Austin permitPlumbing PermitFinal- Record
- 2025-058177 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Changing out 4 ton all in one evap coil
Changing out 4 ton all in one evap coil
City of Austin permitMechanical PermitFinal- Record
- 2023-087204 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of 11.75kw rooftop solar system in pec service territory (916chhu)
Installation of 11.75kw rooftop solar system in pec service territory (916chhu)
City of Austin permitElectrical PermitWithdrawn- Record
- 2023-079777 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9916 Bundoran Dr
What is being built at 9916 Bundoran Dr in Austin?
The records list replacement work, not a new building: a central heating and air system replacement and an earlier water heater replacement.
What work was permitted at 9916 Bundoran Dr in 2026?
Permit 2026-066734 MP, filed June 8, 2026, covers replacement of the existing central heat and air system. Its status is final.
Was a new home permitted at 9916 Bundoran Dr?
The records provided do not show a permit for a new home. They list mechanical, plumbing, and electrical work at the residential address.
Was a water heater replaced at 9916 Bundoran Dr?
Yes. City of Austin plumbing permit 2025-058177 PP, filed May 14, 2025, lists a water heater replacement and is marked final.
Was rooftop solar permitted at 9916 Bundoran Dr?
A permit filed June 26, 2023, described installation of an 11.75-kilowatt rooftop solar system. The permit status is withdrawn.
Also being built nearby
All of 78717- 9908 Bundoran DrSep 20, 2024Addition to existing 2-tory single family residential to include: 2nd story addition of media room · 37 m away
- 9904 Bundoran DrOct 13, 2026Install level 2 ev charger · 56 m away
- 10013 Royal New Kent DrFeb 23, 2026Replacement of an existing water heater · 58 m away
- 9921 Bundoran DrMay 28, 2026120amp panel replacement. no meter work being done. electrical provider - pec · 62 m away
- 15904 Echo Hills DrJul 15, 2025Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 10012 Royal New Kent DrMar 5, 2025Replacement of an existing water heater · 102 m away
- 10000 WhitleyApr 2, 2025*partial demolition* addition of sunroom · 105 m away
- 10004 Royal New Kent DrJul 17, 2025Replacement of complete existing central heat and air system with or without duct work · 118 m away
- 9816 Bundoran DrDec 17, 2025Replacement of complete existing central heat and air system with or without duct work replace current system with new 3 ton and 3.5 ton single stage goodman system. new glxs4 condenser and horizontal coil on r32 refrigerant with gr9s furnace · 134 m away
- 10921 Roy Butler DrJul 15, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton horizontal gas (downstairs) like for like: 3 ton horizontal gas (upstairs) **two system change out · 146 m away
- 9909 Royal New Kent DrMar 16, 2026Replacement of an existing water heater · 151 m away
- 10005 WhitleyJul 21, 2025Replacement of complete existing central heat and air system with or without duct work · 152 m away