9919 Lavon Bnd
Austin, TX 78717
9919 Lavon Bnd: 1 project on record
City of Austin lists 1 filing across 1 project at 9919 Lavon Bnd, Austin, TX 78717. The most recent, filed March 27, 2024, covers: “Ev install”.
Compiled from City of Austin records · updated Mar 27, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 27, 2024
- since Mar 27, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEv install
- AppliedMar 18, 2024
- IssuedMar 27, 2024
- WorkMar '24 – Sep '24
- Final inspectionApr 5, 2024
Passed final inspection Apr 5, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectEv install
Ev install
City of Austin permitElectrical PermitFinal- Record
- 2024-033687 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9919 Lavon Bnd
What is being built at 9919 Lavon Bnd?
The latest filing (City of Austin permit 2024-033687 EP, March 27, 2024) covers ev install.
How many permits and filings does 9919 Lavon Bnd have?
1 filing across 1 project, from March 27, 2024 to March 27, 2024.
Is there other construction near 9919 Lavon Bnd?
Yes. Nearby filings include 9911 Lavon Bnd (ev install, Apr 1, 2024); 10008 Lavon Bnd (pec electric service. installing automatic transfer switch with solar battery system, Aug 22, 2025); 9911 Double Eagle Pass (replacement of complete existing central heat and air system with or without duct work, Apr 4, 2024).
How do I get alerts for new permits at 9919 Lavon Bnd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78717- 9911 Lavon BndApr 1, 2024Ev install · 43 m away
- 10008 Lavon BndAug 22, 2025Pec electric service. installing automatic transfer switch with solar battery system · 93 m away
- 9911 Double Eagle PassApr 4, 2024Replacement of complete existing central heat and air system with or without duct work · 108 m away
- 9915 Double Eagle PassAug 24, 2026Level 2 ev charger installation · 114 m away
- 9913 Ivalenes Hope DrApr 2, 2025Replacement of an existing water heater · 120 m away
- 10001 Double Eagle PassSep 21, 2026Install level 2 ev charger · 135 m away
- 10109 Lavon BndJun 8, 2026Replacement of complete existing central heat and air system with or without duct work · 139 m away
- 10113 Lavon BndOct 23, 2026Adding 60 amp breaker to existing sub panel to feed tesla wall connector. inside garage · 157 m away
- 10001 Ivalenes Hope DrJul 4, 2024Upgrade existing 125a service panel to a 200a service panel. same load. upgrading outdated panel · 161 m away
- 10108 Lavon BndNov 26, 2024Install level 2 ev charger · 174 m away
- 15600 Samuel TrlSep 29, 2026Extending existing covered porch to add an outdoor kitchen on existing 2 story sfr · 185 m away
- 15912 Axehandle TrlJun 9, 2026Ev install · 189 m away