1012 Arthur Stiles Rd
Austin, TX 78721 · Austin ISD
LASA High School plans roof, HVAC and interior work
LASA High School’s registered renovation work includes roof repairs or replacement, HVAC repairs or replacement, and about 400 square feet of interior renovations. The Texas Department of Licensing and Regulation registration was filed August 21, 2026, and lists an applicant-estimated project cost of $21.33 million. Austin records also show an approved track and turf site plan and permits for exterior lighting poles.
Summarized from Texas Department of Licensing and Regulation, City of Austin records · updated Aug 21, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Aug 21, 2026
- since Jan 9, 2025
- Largest scope
- 108,000 sf
- Estimated cost
- $21M
- state registration
Permit & project history
6 projectsProject work will include roof repairs/replacements, hvac system repairs/replacements, and approximately 400 square feet of interior renovations. project scope of work excludes any modifications to existing site conditions: impervious coverage, site — lasa hs
TDLR project registrationRenovation/AlterationReview Complete108,000 sq ft$21M est.- Project #
- TABS2026028483
- Tenant / owner
- Lasa High School
- Design firm
- Pro
- Contact
- Pro
New installation of exterior lighting poles see sheet# 8 of the approved sp. the unique id for this is fbfield
New installation of exterior lighting poles see sheet# 8 of the approved sp. the unique id for this is fbfield
City of Austin permitElectrical PermitActive- Record
- 2025-132032 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New installation of exterior lighting poles see sheet# 8 of the approved sp
New installation of exterior lighting poles see sheet# 8 of the approved sp
City of Austin permitBuilding PermitActive- Record
- 2025-132032 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Stand-alone - conduit only permit work consists of conduit work for the new sports complex at lasa high school. work that is involved: conduit only: for sports lighting scoreboards time-clocks pressboxes was granted the permission by interim director keith mars to pull a stand alone for conduit only so we are not delayed. all other work outside of conduit work will be installed and inspected once the building permit is submitted
Stand-alone - conduit only permit work consists of conduit work for the new sports complex at lasa high school. work that is involved: conduit only: for sports lighting scoreboards time-clocks pressboxes was granted the permission by interim director keith mars to pull a stand alone for conduit only so we are not delayed. all other work outside of conduit work will be installed and inspected once the building permit is submitted
City of Austin permitElectrical PermitExpired- Record
- 2025-119669 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Project seeks replacement of roof of existing building; replacement of existing failed roof membrane with new modified bitumen roofing system including insulation to bring up to ahj adopted energy code
Project seeks replacement of roof of existing building; replacement of existing failed roof membrane with new modified bitumen roofing system including insulation to bring up to ahj adopted energy code
City of Austin permitPlumbing PermitFinal- Record
- 2024-152864 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation · City of Austin
Questions about 1012 Arthur Stiles Rd
What is being built at 1012 Arthur Stiles Rd?
Records show renovation work at LASA High School, including roof and HVAC repairs or replacements and about 400 square feet of interior renovations. Separate Austin records cover track and turf work and exterior lighting poles.
Is a new LASA High School being built in Austin?
The records describe renovation and site work at the existing high school, not a new school building. The TDLR project registration was filed August 21, 2026.
What work is planned at LASA High School?
The TDLR registration lists roof repairs or replacements, HVAC repairs or replacements, and approximately 400 square feet of interior renovations. It also says the project excludes changes to existing site conditions and impervious coverage.
Is LASA High School getting a new track and turf?
Austin case 13404633 for “LASA Highschool Track & Turf” was approved and released on January 29, 2026.
What exterior work is planned at LASA High School?
Austin building and electrical permits filed October 15 and 16, 2025, cover installation of exterior lighting poles. An earlier electrical permit filed September 24, 2025, describes conduit for sports lighting, scoreboards, time clocks, and press boxes.
What's being updated near LASA Hs - Exterior Additions?
The LASA High School renovation registration covers roof and HVAC work and about 400 square feet of interior renovations. The nearby exterior additions record describes bleachers, a press box, and storage containers.
Also being built nearby
All of 78721- 1012 Arthur Stiles Road · Austin Independent School DistrictDec 8, 2025Lasa hs - exterior additions — additions to existing building — new construction of bleachers, pressbox, and storage containers · 88 m away
- 1003 Arthur Stiles RdNov 3, 2026Express- replace 10 windows in the property siding repair · 118 m away
- 6207 Mayhall DrJan 3, 2024Express replace 6 windows (like for like) · 147 m away
- 1025 Gardner RdAug 21, 2026Express: replace tub to shower 1-piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space · 159 m away
- 1026 Gardner RdOct 8, 2024Replace drain lines under house via tunnel. ** 12 tunnel. 1 access hole locate at the front right of the home · 187 m away
- 6106 Calmar CvFeb 15, 2024Mini split replacement · 189 m away
- 1033 Arthur Stiles RdJan 30, 2025Replacement of complete existing central heat and air system with or without duct work · 197 m away
- 1117 Altum StMay 26, 2026Replacement of complete existing central heat and air system with or without duct work · 204 m away
- 1066 Gardner RdDec 19, 2023Replacement of an existing water heater and replaced prv in yard · 231 m away
- 5932 Lux StMay 7, 2024Replacement of complete existing central heat and air system with or without duct work · 242 m away
- 5933 Lux StDec 17, 2025Addition - enclosing a patio using exisitng concrete slab. we will be constrcuting a single slope roof walls with (2) window units and (1) door unit spray foam insulation will be applied (4) new duplex outlets switches (4) can lights (1) ceiling fan circut. sheetrock trim paint and flooring will be applied to finish out. no hvac · 245 m away
- 5932 Ventus StJun 7, 2024New pool · 246 m away