1113 Walton Ln
Austin, TX 78721
1113 Walton Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 1113 Walton Ln, Austin, TX 78721. The most recent, filed June 1, 2018, covers: “Walton subdivision”.
Compiled from City of Austin records · updated Jun 1, 2018
- Projects
- 1
- 1 filings
- Latest filing
- Jun 1, 2018
- since Jun 1, 2018
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 1113 Walton Ln
What is being built at 1113 Walton Ln?
The latest filing (City of Austin case 11697623, June 1, 2018) covers walton subdivision.
How many permits and filings does 1113 Walton Ln have?
1 filing across 1 project, from June 1, 2018 to June 1, 2018.
Is there other construction near 1113 Walton Ln?
Yes. Nearby filings include 1116 Walton Ln (walton woods - project assessment, Jan 21, 2022); 1119 Walton Ln (1119 walton lane, Jan 23, 2017); 5606 Steven Creek Way (panel is a 100 amp we need to upgrade to 200 amp so we can install pool circuits, Jul 11, 2025).
How do I get alerts for new permits at 1113 Walton Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78721- 1116 Walton LnJan 21, 2022Walton woods - project assessment · 56 m away
- 1119 Walton LnJan 23, 20171119 walton lane · 64 m away
- 5606 Steven Creek WayJul 11, 2025Panel is a 100 amp we need to upgrade to 200 amp so we can install pool circuits · 85 m away
- 1104 Walton LnAug 31, 2016Walton terrace · 85 m away
- 1120 Walton LnMay 27, 2024T pole · 86 m away
- 1102 Walton LnJan 8, 2025Replacement of an existing water heater · 93 m away
- 1123 Walton LnJan 13, 2016Walton place · 101 m away
- 5616 Steven Creek WayAug 13, 2025Replacement of an existing water heater · 133 m away
- 5701 Bolm RdJul 8, 2026Upgrade to a 200amp service · 144 m away
- 5705 Bolm RdJun 24, 2024Replacement of complete existing central heat and air system with or without duct work · 145 m away
- 1104 Emmitt RunFeb 20, 2025Kitchen remodel. the following non-load bearing walls will be removed. the pony wall between living room and dining room partitions between kitchen and dining room/hallway and the two partitions that form pantry. see engineering report for structural verification. pipes for the sink and dishwasher will be shifted. three light switches will be relocated due to wall removal. lights and gfci outlets will be added to the new countertop areas · 151 m away
- 1106 Perry RdMar 2, 2007Edward joseph subdivision (smart housing) — edward joseph subdivision (smart housing) · 153 m away