1184 Sarabeth Way
Austin, TX 78721
EV charging circuit permitted at 1184 Sarabeth Way
A circuit for an electric vehicle charging station was permitted at 1184 Sarabeth Way in Austin. The City of Austin electrical permit was filed March 23, 2026, and is listed with Final status.
Summarized from City of Austin records · updated Mar 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 23, 2026
- since Mar 23, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled(bentson brian) - installation of circuit for elec. vehicle charging station - esip
- AppliedMar 18, 2026
- IssuedMar 23, 2026
- WorkMar '26 – Sep '26
- Final inspectionMar 26, 2026
Passed final inspection Mar 26, 2026.
1 contact on this project
Permit & project history
1 project(bentson brian) - installation of circuit for elec. vehicle charging station - esip
(bentson brian) - installation of circuit for elec. vehicle charging station - esip
City of Austin permitElectrical PermitFinal- Record
- 2026-032617 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1184 Sarabeth Way
What is being built at 1184 Sarabeth Way?
A City of Austin permit describes installation of a circuit for an electric vehicle charging station. It does not specify other construction.
When was the EV charging circuit permitted?
The permit was filed March 23, 2026.
What is the permit number for 1184 Sarabeth Way?
The City of Austin electrical permit number is 2026-032617 EP.
Is the permit for an EV charger or just its electrical circuit?
The permit description specifies installation of a circuit for an electric vehicle charging station; it does not provide further details about the charging equipment.
What is the status of the permit?
The City of Austin record lists the permit as Final.
How much will the EV charging work cost?
The permit record does not include a reported valuation or project cost.
Also being built nearby
All of 78721- 1188 Sarabeth WayJun 6, 2024Homebuilder loop- ref# 2021-013271 bp austin full purpose · 19 m away
- 1191 Greenwood AveMar 12, 2025Naiman - install new 6.4kw rooftop solar system to existing residential only using backfed breaker · 47 m away
- 3412 Pennsylvania AveJul 22, 2019Penn place cottages b · 57 m away
- 1183 Sarabeth WayMar 23, 2026(paulon giorgio) - installation of circuit for elec. vehicle charging station - esip · 62 m away
- 3414 Pennsylvania AveOct 2, 2026Expedited review: new autofill pool · 74 m away
- 1195 Greenwood AveFeb 24, 2026Express: re-do shower replace gecis in bathroom and kitchen replace rear exterior light replace all windows like-like · 74 m away
- 3409 Pennsylvania AveOct 22, 2018Penn heights two(with/resub of (c8-2017-0083.0a) · 77 m away
- 3401 Pennsylvania AveAug 13, 2025Pennsylvania · 79 m away
- 1190 Greenwood AveJun 9, 2025Express - installing 7 steel push piers · 81 m away
- 1197 Greenwood AveOct 22, 2018Resubdivison of lot 4 berth furgeson subdivision (with r c8-2016-0048.0a) · 90 m away
- 3413 Pennsylvania AveMar 28, 2025Re-do sewer line · 92 m away
- 3500 Pennsylvania AveMar 4, 20247.29 kw residential rooftop solar installation · 102 m away