1605 Webberville Rd
Austin, TX 78721
1605 Webberville Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 1605 Webberville Rd, Austin, TX 78721. The most recent, filed October 28, 2010, covers: “Cleveland day care center”.
Compiled from City of Austin records · updated Oct 28, 2010
- Projects
- 1
- 1 filings
- Latest filing
- Oct 28, 2010
- since Oct 28, 2010
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 1605 Webberville Rd
What is being built at 1605 Webberville Rd?
The latest filing (City of Austin case 208835, October 28, 2010) covers cleveland day care center.
How many permits and filings does 1605 Webberville Rd have?
1 filing across 1 project, from October 28, 2010 to October 28, 2010.
Is there other construction near 1605 Webberville Rd?
Yes. Nearby filings include 1601 Webberville Rd (webberville road addition, Mar 2, 2018); 1602 Webberville Rd (new 2-story duplex with covered porches 8/8, Dec 15, 2025); 1602 Meander Dr (replace approximately 25 feet of cast iron pipe for pvc pipe by making a tunnel under the slab, Apr 12, 2024).
How do I get alerts for new permits at 1605 Webberville Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78721- 1601 Webberville RdMar 2, 2018Webberville road addition · 29 m away
- 1602 Webberville RdDec 15, 2025New 2-story duplex with covered porches 8/8 · 47 m away
- 1602 Meander DrApr 12, 2024Replace approximately 25 feet of cast iron pipe for pvc pipe by making a tunnel under the slab · 70 m away
- 1608 Meander DrJun 10, 2025Construct new driveway approach of 12 ft · 74 m away
- 5011 Rob Scott StJul 11, 202550 gallon electric tank install water heater 5011 rob-scott street austin tx 78721 · 103 m away
- 5013 Rob Scott StSep 11, 2025Construct new driveway approach of 12 ft and sidewalk of 33 lf · 105 m away
- 1609 Meander DrJul 31, 202612 tunnel below the foundation to spot repair both bathroom drain lines. 1 access hole in back · 123 m away
- 5303 Downs DrNov 25, 2025Express: tub-shower conversion · 133 m away
- 5301 Downs DrApr 17, 2024Replacement of complete existing central heat and air system with or without duct work · 134 m away
- 5315 Downs DrMay 26, 202535ft tunnel under slab to remove damaged existing sewer line and 25ft sewer line repair · 136 m away
- 1429 Webberville RdFeb 20, 2026New in-ground 144 sq ft concrete pool and associated equipment and pad. ***autofill piping connected at skimmer***12/10/2025--slc · 137 m away
- 1428 Webberville RdJun 2, 2025Emergency (storm damage) - service replacement ***storm related-emergency inspection done on 5/30/35. espa is required.-hyatt · 142 m away