East Side Church of Christ Phase Three site plans approved
City of Austin records show site plans for East Side Church of Christ Phase Three at 5701 Martin Luther King Jr Blvd. The latest cases, 10067037 and 12366144, were approved and released on July 17, 2026; the records do not specify the project’s size or cost.
Summarized from City of Austin records · updated Jul 17, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Jul 17, 2026
- since Jun 5, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsSources: City of Austin
Questions about 5701 Martin Luther King Jr Blvd
What is being built at 5701 Martin Luther King Jr Blvd?
City records list a Phase Three site-plan project for East Side Church of Christ. The latest related cases were approved and released on July 17, 2026.
Is the East Side Church of Christ project approved?
The City of Austin lists cases 10067037 and 12366144 as Approved and Released on July 17, 2026.
When was the site plan for 5701 Martin Luther King Jr Blvd approved?
The latest site-plan cases, 10067037 and 12366144, were approved and released on July 17, 2026.
How much will the East Side Church of Christ Phase Three project cost?
The records provided do not include a project cost or valuation.
How big is the East Side Church of Christ Phase Three project?
The City records provided do not list the project’s square footage.
Was an earlier East Side Church of Christ Phase Three application withdrawn?
Yes. Case 12035396, filed for East Side Church of Christ Phase Three, was withdrawn on September 10, 2024. Later cases 10067037 and 12366144 were approved and released on July 17, 2026.
Also being built nearby
All of 78721- 5701 E Martin Luther King Jr BlvdMay 21, 2025Access control
- 5800 Martin Luther King Jr BlvdFeb 3, 2013East austin college preparatory academy, elementary classroom portables · 96 m away
- 5718 Martin Luther King Jr BlvdMay 18, 2026Mlk storage · 112 m away
- 5718 E Martin Luther King Jr BlvdSep 22, 2026Extra space storage channel letters · 112 m away
- 5718 E. Martin Luther King Jr. Blvd · Seamless Storage @ MlkMar 19, 2025Seamless storage @ mlk — new construction — 4-story building with partial basement, climatized self-storage, office, & loading area. features slab on grade foundation, metal studs, & metal roof. mechanical, electrical & plumbing to be completed. site work includes paving, utilities, & landscape · 169 m away
- 4904 Tannehill LnFeb 23, 2026Express: foundation repair · 234 m away
- 5612 E Martin Luther King Jr BlvdAug 19, 2026Replace drain lines under home via tunnel · 234 m away
- 5600 E Martin Luther King Jr BlvdOct 22, 2024Replacement of an existing water heater · 275 m away
- 4617 Tannehill LnJun 6, 2025Millennium eastside multifamily · 277 m away
- 4807 Eastdale DrFeb 5, 2024Repair gas leak at water heater · 284 m away
- 4901 Eastdale DrNov 21, 2024Change out water heater to existing residence · 306 m away
- 4903 Eastdale DrMay 28, 2024Request to disconnect replace the breaker box and main breaker next to the meter can and replace a sub panel 20 from the main breaker. both have been damaged. the meter will need to be removed to replace the conductor from the existing meter base to the main and to replace the main disconnect and re-secure the meter can. the line side will not be disconnect from the weatherhead · 315 m away