1308 Norwood Rd
Austin, TX 78722
Central heating and air system replacement at 1308 Norwood Rd
A City of Austin mechanical permit covers replacement of the existing central heating and air system at 1308 Norwood Rd, with or without duct work. The permit, 2026-135099 MP, was filed on October 20, 2026, and is listed as active.
Summarized from City of Austin records · updated Oct 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 20, 2026
- since Oct 20, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplacement of complete existing central heat and air system with or without duct work
- AppliedOct 14, 2026
- IssuedOct 20, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitActive- Record
- 2026-135099 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1308 Norwood Rd
What is happening at 1308 Norwood Rd in Austin?
A City of Austin permit covers replacing the existing central heat and air system, with or without duct work. Permit 2026-135099 MP was filed on October 20, 2026.
Is a new building being built at 1308 Norwood Rd?
The permit record is for replacing an existing central heating and air system. It does not describe construction of a new building.
When was the HVAC permit filed for 1308 Norwood Rd?
The City of Austin filed mechanical permit 2026-135099 MP on October 20, 2026. Its status is listed as active.
What does permit 2026-135099 MP cover?
It covers replacement of the complete existing central heat and air system, with or without duct work, at 1308 Norwood Rd.
What is happening near ATI Physical Therapy in Austin?
At 1308 Norwood Rd, about 289 meters from ATI Physical Therapy at 1401 Philomena Street, a permit covers replacement of an existing central heating and air system. The permit was filed on October 20, 2026.
Also being built nearby
All of 78722- 1312 Norwood RdNov 30, 2023Replacement of complete existing central heat and air system with or without duct work · 43 m away
- 4609 Parkwood RdDec 4, 2025Tunnel under foundation to repipe drain lines under foundation for one bathroom kitchen and washer drain. total length of tunnel 30 feet with 2 access holes. sewer line replacement from the home to the city tap connection · 62 m away
- 4607 Parkwood RdMar 15, 202440 gallon gas water heater swap out · 73 m away
- 1216 Norwood RdDec 4, 2023(samuels thomas)- installation of circuit for elec. vehicle charging station-esip · 90 m away
- 1308 Bentwood RdJul 5, 2024Irrigation system installation · 101 m away
- 1215 Norwood RdMar 23, 202612x24 shed construction at rear of property with slab foundation electrical service wired from subpanel off of main panel · 104 m away
- 1310 Bentwood RdJun 12, 2024Irrigation system installation · 104 m away
- 1304 Bentwood RdJun 11, 2024Excavate 80 to repair main drain line under home · 105 m away
- 4603 Parkwood RdMay 21, 2026Interior remodel + porch enclosure including flooring cabinets fixtures finishes lighting painting window replacements plumbing moving water heater electrical adding sockets and connections. enclosing covered porch in backyard adding exterior door and 2 windows · 107 m away
- 1213 Norwood RdJun 5, 2026New gas line for the dryer in the carport · 123 m away
- 1311 Philomena StDec 5, 2007Mueller section iii resubdivision · 131 m away
- 1309 Bentwood RdJul 31, 2026Excavate 8 tunnel to repair main drain line under the house · 145 m away