groundranger
Recent · latest filing Oct 2025Commercial

1900 E Martin Luther King Jr Blvd

Austin, TX 78722

Electrical panel and service upgrades at 1900 E MLK Jr Blvd

City of Austin records show electrical panel and service upgrades at 1900 E Martin Luther King Jr Blvd, rather than a new building project. Two electrical permits were filed on October 27, 2025: permit 2025-123790 EP is marked Final, and permit 2025-106075 EP is marked Withdrawn.

Summarized from City of Austin records · updated Oct 27, 2025

Projects
2
2 filings
Latest filing
Oct 27, 2025
since Oct 27, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Full-service upgrade from 125a panel to 200a panel. scope includes disconnect and reconnect of service installation of a new 2inch ridged conduit with associated new meter can and socket upgrading existing meter not adding an additional. new breakers and wire associated with new panel only primary feeders upgraded branch circuits to remain

  1. AppliedSep 29, 2025
  2. IssuedOct 27, 2025
  3. WorkOct '25 – Dec '25
  4. Final inspectionJul 13, 2026

Passed final inspection Jul 13, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Full-service upgrade from 125a panel to 200a panel. scope includes disconnect and reconnect of service installation of a new 2inch ridged conduit with associated new meter can and socket upgrading existing meter not adding an additional. new breakers and wire associated with new panel only primary feeders upgraded branch circuits to remain

    Full-service upgrade from 125a panel to 200a panel. scope includes disconnect and reconnect of service installation of a new 2inch ridged conduit with associated new meter can and socket upgrading existing meter not adding an additional. new breakers and wire associated with new panel only primary feeders upgraded branch circuits to remain

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. 100 amp to 200 amp panel replacement and meter can replacement

    100 amp to 200 amp panel replacement and meter can replacement

    City of Austin permitElectrical PermitWithdrawn
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1900 E Martin Luther King Jr Blvd

What is happening at 1900 E Martin Luther King Jr Blvd?

Austin permit records describe electrical panel and service upgrades, including an upgrade from a 125-amp panel to a 200-amp panel. They do not describe a new building.

Is a new building being built at 1900 E Martin Luther King Jr Blvd?

The available records describe electrical work, not new building construction. The permits were filed on October 27, 2025.

What electrical work is planned at 1900 E Martin Luther King Jr Blvd?

Permit 2025-123790 EP describes a 125-amp-to-200-amp panel upgrade, new conduit and meter equipment, and related wiring work. It is marked Final.

What happened to the second electrical permit at 1900 E Martin Luther King Jr Blvd?

Permit 2025-106075 EP, for a 100-amp-to-200-amp panel and meter-can replacement, is marked Withdrawn. It was filed on October 27, 2025.

When were permits filed for 1900 E Martin Luther King Jr Blvd?

Both City of Austin electrical permits were filed on October 27, 2025. One is marked Final and the other Withdrawn.

Also being built nearby

All of 78722
Email me when a new permit is filed