2506 Weber Ave
Austin, TX 78722
2506 Weber Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 2506 Weber Ave, Austin, TX 78722. The most recent, filed January 25, 2024, covers: “Emergency permit to relace complete service with like for like. approved to energize @ 13:18 01/24/2024. in ss on teams---slc”.
Compiled from City of Austin records · updated Jan 25, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 25, 2024
- since Jan 25, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEmergency permit to relace complete service with like for like. approved to energize @ 13:18 01/24/2024. in ss on teams---slc
- AppliedJan 24, 2024
- IssuedJan 25, 2024
- WorkJan '24 – Jan '24
- Final inspectionFeb 2, 2024
Passed final inspection Feb 2, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectEmergency permit to relace complete service with like for like. approved to energize @ 13:18 01/24/2024. in ss on teams---slc
Emergency permit to relace complete service with like for like. approved to energize @ 13:18 01/24/2024. in ss on teams---slc
City of Austin permitElectrical PermitFinal- Record
- 2024-008886 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2506 Weber Ave
What is being built at 2506 Weber Ave?
The latest filing (City of Austin permit 2024-008886 EP, January 25, 2024) covers emergency permit to relace complete service with like for like. approved to energize @ 13:18 01/24/2024. in ss on teams---slc.
How many permits and filings does 2506 Weber Ave have?
1 filing across 1 project, from January 25, 2024 to January 25, 2024.
Is there other construction near 2506 Weber Ave?
Yes. Nearby filings include 2508 Weber Ave (installation of 150a meter loop service at 2508 weber ave atx 78722, Oct 26, 2026); 2502 Weber Ave (replacement of complete existing central heat and air system with or without duct work, Jan 24, 2024); 2100 Stafford St (damage electrical meter can replacing meter and electrical service with new, Jun 11, 2025).
How do I get alerts for new permits at 2506 Weber Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78722- 2508 Weber AveOct 26, 2026Installation of 150a meter loop service at 2508 weber ave atx 78722 · 17 m away
- 2502 Weber AveJan 24, 2024Replacement of complete existing central heat and air system with or without duct work · 38 m away
- 2100 Stafford StJun 11, 2025Damage electrical meter can replacing meter and electrical service with new · 43 m away
- 2507 Weber AveMar 6, 2025Wood deck attached to primary · 43 m away
- 2103 Stafford StMay 28, 2024Run 5 new electrical lines (three 120v two 240v) from the panel through the attic and to the exterior to support the installation of five new mini split heating/cooling units. will use wire gauges and breaker sizes specified by the manufacturer. nm wire for interior portion thwn for exterior portion in glued pvc conduit. interior wire will be staples every 4 using nm staples. junction boxes in attic will be accessible mounted to 2x4s suspended from rafters to (a) keep them from being buried by cellulose insulation and (b) to keep them from being immediately under the hot roof · 88 m away
- 2007 Maple AveJun 29, 2026Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 2105 Maldon PlMay 24, 2024Customer want to upgrade his current electrical service for new 200 amp service new drop service new 200 amp outdoor panel and new sub panel inside the property · 90 m away
- 2506 Givens AveApr 22, 2024Addition - demolition rear deck and porch enclose carport new wood deck at rear remove bay windows reconfigure interior layout for open living concept · 90 m away
- 2502 Givens AveOct 29, 2026Installation of 12.3kw dc of solar on residential home · 91 m away
- 2508 Givens AveJul 15, 2026Install a complete new irrigation system including a 1-inch isolation valve 1-inch backflow preventer with a wye strainer master valve and six irrigation control valves configured as follows: * four valves to operate mp rotator spray heads for the turf areas. * one valve to operate rotor spray heads for the larger turf areas. * one drip irrigation valve to supply the drip lines in the front landscape beds. the system will also include an irrigation controller and a rain sensor for automatic scheduling and irrigation management · 93 m away
- 2500 Givens AveJun 29, 2026Spa 8x10ft with a gas heater and autofil. 90 sq ft of concrete decking and 24 sq ft of concrete pad for equipment · 96 m away
- 2000 Cedar AveNov 17, 2026Interior remodel and new full bath and kitchen add and remove interior walls replace siding windows and doors re-roof (deck and shingles only) · 98 m away