3113 Lafayette Ave
Austin, TX 78722
3113 Lafayette Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 3113 Lafayette Ave, Austin, TX 78722. The most recent, filed October 3, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Oct 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 3, 2024
- since Oct 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedSep 30, 2024
- IssuedOct 3, 2024
- WorkOct '24 – Nov '24
- Final inspectionNov 7, 2024
Passed final inspection Nov 7, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-132149 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3113 Lafayette Ave
What is being built at 3113 Lafayette Ave?
The latest filing (City of Austin permit 2024-132149 MP, October 3, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 3113 Lafayette Ave have?
1 filing across 1 project, from October 3, 2024 to October 3, 2024.
Is there other construction near 3113 Lafayette Ave?
Yes. Nearby filings include 3111 Lafayette Ave (replacement of complete existing central heat and air system with or without duct work like for like: 3 ton gas horizontal system, May 30, 2026); 3107 Lafayette Ave (who home rewire & install/replace 150 amp main breaker panel and meter can (overhead) 8/24/26 sm - revised ** moving service from illegal location on building 1 to back side of building 2. using existing underground to feed back to building 1 new exterior subpanel at building 1 building 1 is 125 amp building 2 is 150 amp, Jul 14, 2026); 3108 Lafayette Ave (express: tub to shower conversion, Feb 7, 2024).
How do I get alerts for new permits at 3113 Lafayette Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78722- 3111 Lafayette AveMay 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton gas horizontal system · 14 m away
- 3107 Lafayette AveJul 14, 2026Who home rewire & install/replace 150 amp main breaker panel and meter can (overhead) 8/24/26 sm - revised ** moving service from illegal location on building 1 to back side of building 2. using existing underground to feed back to building 1 new exterior subpanel at building 1 building 1 is 125 amp building 2 is 150 amp · 47 m away
- 3108 Lafayette AveFeb 7, 2024Express: tub to shower conversion · 52 m away
- 3106 Lafayette AveMar 5, 2026Ran a dedicated circuit to the water heater and upgraded the breaker in the panel · 64 m away
- 3205 Lafayette AveMar 25, 2026Addition/interior remodel - primary bathroom remodel primary closet addition to existing house. new accessory building with exercise room guest room and bathroom · 65 m away
- 3202 Lafayette AveJul 14, 2026Eplan: residential expedited review - addition/remodel existing 1-story single family res. to 2-story [3bed 2bath] with attached garage work to include interior remodel 1st and 2nd floor additions · 65 m away
- 3104 Lafayette AveOct 28, 2024New inground swimming pool with reqd enclosure device for two unit residential use · 76 m away
- 3103 Lafayette AveApr 24, 2026Gas leak- red tag- texas gas service · 78 m away
- 3207 Lafayette AveApr 26, 2024Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 3100 Lafayette AveOct 6, 2025Change out: replace 50 gallon tank-type with natural gas tankless 199000 btu water heater & gas pipe addition/ replacement · 104 m away
- 3209 French PlJul 10, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 104 m away
- 3213 French PlJul 17, 2025Tunnel under home to replumb/reroute sewer line up to city tap location · 106 m away