3711 Werner Ave
Austin, TX 78722
Werner Ave home gets HVAC and electrical upgrades
Austin permits indicate replacement of the existing central heating and air system and electrical service at 3711 Werner Ave. The electrical permit was filed March 18, 2026, and the mechanical permit was filed April 30, 2026; both are marked final.
Summarized from City of Austin records · updated Apr 30, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 30, 2026
- since Mar 18, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work like for like: 2 ton gas vertical system
- AppliedApr 28, 2026
- IssuedApr 30, 2026
- WorkApr '26 – May '26
- Final inspectionMay 11, 2026
Passed final inspection May 11, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work like for like: 2 ton gas vertical system
Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton gas vertical system
City of Austin permitMechanical PermitFinal- Record
- 2026-052203 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
The existing electrical service will be demolished and a new one installed including a new electric meter box a new box with a main disconnect new electrical conduit and new cables
The existing electrical service will be demolished and a new one installed including a new electric meter box a new box with a main disconnect new electrical conduit and new cables
City of Austin permitElectrical PermitFinal- Record
- 2026-031136 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3711 Werner Ave
What is being done at 3711 Werner Ave in Austin?
Permits indicate an electrical service replacement and replacement of the existing central heating and air system.
Was a permit filed for work at 3711 Werner Ave?
Yes. Austin filed electrical permit 2026-031136 EP on March 18, 2026, and mechanical permit 2026-052203 MP on April 30, 2026. Both are marked final.
Is a new house being built at 3711 Werner Ave?
The records provided do not describe new construction. They cover replacement of the existing electrical service and central heating and air system.
What HVAC work is permitted at 3711 Werner Ave?
Mechanical permit 2026-052203 MP, filed April 30, 2026, covers like-for-like replacement of the existing central heat and air system with a 2-ton gas vertical system, with or without duct work.
What electrical work is permitted at 3711 Werner Ave?
Electrical permit 2026-031136 EP, filed March 18, 2026, covers demolishing and replacing the existing electrical service, including the meter box, main disconnect box, conduit and cables.
Also being built nearby
All of 78722- 3715 Werner AveMar 9, 2026Replacement of complete existing central heat and air system with or without duct work · 31 m away
- 3704 Lafayette AveNov 13, 2024Tunnel under foundation for unit a to replumb kitchen sinkone bathroom and laundry line · 37 m away
- 3700 Lafayette AveJul 15, 2025Addition/ remodel of 1-story sfr · 56 m away
- 3703 Werner AveJun 2, 2025Emergency due to thunderstorm. emergency replacement of full service loop including meter riser & panel due to fire. ***storm related-emergency inspection done on 5/31/25. espa required-hyatt · 59 m away
- 1300 E 38th Half StSep 21, 2026Interior tenant finish-out and change of use from f-1 to personal improvement services for a fitness facility (crossfit sanity). work includes interior modifications installation of fitness flooring installation of a required fire barrier wall minor window replacement and installation of non-structural fitness equipment. painting of interior walls and exterior wall · 77 m away
- 3701 Werner AveJun 9, 2025Emergency replacement of full service loop including meter riser & panel due to off & on power loss. not storm related · 77 m away
- 3713 Hollywood AveSep 4, 2024Replacement of complete existing central heat and air system with or without duct work · 82 m away
- 3705 Hollywood AveSep 28, 2026Eplan: residential expedited review - addition to existing single family res. scope of work to include bedroom with closet and mudroom addition new exterior doors and windows new exterior concrete landing at the mudroom door front porch modifications including removal of the existing front porch column ribbon driveway modifications and removal of the existing stepping stone walk · 94 m away
- 3510 Werner AveNov 21, 2024Gas test to exting resid only · 108 m away
- 3701 Hollywood AveMar 17, 2025Stan alone permit for a service upgrade of a 200 panel up to todays code · 113 m away
- 3507 Werner AveApr 28, 2025Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 3710 Hollywood AveApr 1, 2026Rebuilding electrical service for residential customer · 126 m away