3812 Sycamore Dr
Austin, TX 78722
3812 Sycamore Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3812 Sycamore Dr, Austin, TX 78722. The most recent, filed August 7, 2025, covers: “Request to disconnect and reconnect. homeowner has a 200 amp disconnect that is old and would like to upgrade to a new system for 225 amps”.
Compiled from City of Austin records · updated Aug 7, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 7, 2025
- since Aug 7, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRequest to disconnect and reconnect. homeowner has a 200 amp disconnect that is old and would like to upgrade to a new system for 225 amps
- AppliedAug 6, 2025
- IssuedAug 7, 2025
- WorkAug '25 – Aug '25
- Final inspectionAug 21, 2025
Passed final inspection Aug 21, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectRequest to disconnect and reconnect. homeowner has a 200 amp disconnect that is old and would like to upgrade to a new system for 225 amps
Request to disconnect and reconnect. homeowner has a 200 amp disconnect that is old and would like to upgrade to a new system for 225 amps
City of Austin permitElectrical PermitFinal- Record
- 2025-099617 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3812 Sycamore Dr
What is being built at 3812 Sycamore Dr?
The latest filing (City of Austin permit 2025-099617 EP, August 7, 2025) covers request to disconnect and reconnect. homeowner has a 200 amp disconnect that is old and would like to upgrade to a new system for 225 amps.
How many permits and filings does 3812 Sycamore Dr have?
1 filing across 1 project, from August 7, 2025 to August 7, 2025.
Is there other construction near 3812 Sycamore Dr?
Yes. Nearby filings include 3810 Sycamore Dr (request to disconnect service upgrade of 150amp overhead to new 225amp, Apr 16, 2025); 1713 E 38th Half St (replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork, Apr 15, 2026); 1711 E 38th Half St (expedited review: addition and interior remodel to existing 1-story single family res. work to include new bedroom bath laundry area and relocate kitchen. interior remodel of existing bathroom and center of home [3bed 2bath], Jan 9, 2024).
How do I get alerts for new permits at 3812 Sycamore Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78722- 3810 Sycamore DrApr 16, 2025Request to disconnect service upgrade of 150amp overhead to new 225amp · 35 m away
- 1713 E 38th Half StApr 15, 2026Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork · 79 m away
- 1711 E 38th Half StJan 9, 2024Expedited review: addition and interior remodel to existing 1-story single family res. work to include new bedroom bath laundry area and relocate kitchen. interior remodel of existing bathroom and center of home [3bed 2bath] · 82 m away
- 3814 Half Penny RdSep 8, 2026Express: replace 1 window (like for like) · 84 m away
- 3813 Willowbrook DrDec 19, 2025Replacement of an existing water heater replace 50 gallon electric heating pump water heater location: closet inside home · 86 m away
- 1707 E 38th Half StSep 27, 2024Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 3807 Willowbrook DrJul 14, 2026Small bathroom update rewire electrical switch and sink outlet add ceiling light box run 120v outlet for clothes washer run 240v outlet for dryer *50 sq ft max sheetrock · 104 m away
- 1721 E 38th Half StAug 24, 2026Porch conversion on 1-story single family residence to conditioned space: remove existing screen on covered back patio and replace with board and batten walls to match existing home. add outlets and a mini split · 108 m away
- 3905 Willowbrook DrOct 2, 2024Install 5.52 kw dc solar with 20.0 kwh ess · 120 m away
- 3815 Cherrywood RdMay 2, 2024Replace a section of sewer line to the main sewer line in the front yard total of 30 feet · 124 m away
- 3904 Brookview RdAug 10, 2026Eplan: residential expedited review - addition to existing 1-story single family residence. work to include primary suite addition to existing single family residence addition incorporates existing rear porch and carport. existing residence to be renovated with new bathroom and kitchen fixtures and fittings in existing locations · 126 m away
- 3900 Brookview RdAug 22, 2025We moved the grinder pump · 130 m away