City of Austin lists 3 filings across 3 projects at 4007 Lullwood Rd, Austin, TX 78722. The most recent, filed November 29, 2023, covers: “Replacement of complete existing central heat and air system”.
Compiled from City of Austin records · updated Nov 29, 2023
- Projects
- 3
- 3 filings
- Latest filing
- Nov 29, 2023
- since Nov 29, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system
- AppliedNov 29, 2023
- IssuedNov 29, 2023
- WorkNov '23 – Dec '23
- Final inspectionDec 19, 2023
Passed final inspection Dec 19, 2023.
1 contact on this project · 1 phone number
Permit & project history
3 projectsReplacement of complete existing central heat and air system
Replacement of complete existing central heat and air system
City of Austin permitMechanical PermitFinal- Record
- 2023-152962 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Trench out roughly 135/140 feet of outside yard line. remove old cast iron sewer line and replace using schedule 40 pvc. bed new yard line with sand per code
Trench out roughly 135/140 feet of outside yard line. remove old cast iron sewer line and replace using schedule 40 pvc. bed new yard line with sand per code
City of Austin permitPlumbing PermitFinal- Record
- 2023-145142 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Electrical connection from house to new backyard shed as an office space via sub panel. the office will consist of electrical outlets and lights shed is 192 square feet
Electrical connection from house to new backyard shed as an office space via sub panel. the office will consist of electrical outlets and lights shed is 192 square feet
City of Austin permitElectrical PermitFinal- Record
- 2023-102915 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4007 Lullwood Rd
What is being built at 4007 Lullwood Rd?
The latest filing (City of Austin permit 2023-152962 MP, November 29, 2023) covers replacement of complete existing central heat and air system.
How many permits and filings does 4007 Lullwood Rd have?
3 filings across 3 projects, from November 29, 2023 to November 29, 2023.
Is there other construction near 4007 Lullwood Rd?
Yes. Nearby filings include 4009 Lullwood Rd (53ft sewer yard line and 40ft gas line, Oct 17, 2024); 4003 Lullwood Rd (express: remove and replace siding and windows (like for like), Aug 21, 2025); 1407 Wilshire Blvd (complete service rebuild & relocation like for like, Dec 22, 2023).
How do I get alerts for new permits at 4007 Lullwood Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78722- 4009 Lullwood RdOct 17, 202453ft sewer yard line and 40ft gas line · 32 m away
- 4003 Lullwood RdAug 21, 2025Express: remove and replace siding and windows (like for like) · 47 m away
- 1407 Wilshire BlvdDec 22, 2023Complete service rebuild & relocation like for like · 48 m away
- 4016 Maplewood AveMay 2, 2024Replacement of complete existing central heat and air system with or without duct work · 49 m away
- 1404 Wilshire BlvdSep 11, 2025Express: remove and replace 4 windows (like for like) · 86 m away
- 4103 Lullwood RdJun 13, 2025Storm damage to overhead drop. overhead line was hanging too low but still had power. customer called ae to address overhead. upon inspecting old cloth riser and outdated meter can ae disconnected overhead and pulled meter. requesting full service upgrade. riser through roof with weather head and point of attachment. new meter can and main panel · 111 m away
- 4106 Lullwood RdDec 13, 2024Addition and remodel existing residence will be fully renovated including kitchen bathrooms laundry. 290 sq ft garage addition to existing garage · 112 m away
- 1502 Kirkwood RdNov 9, 202612 tunnel below the foundation to get to below the pier and beam foundation and replace any remaining cast iron drain lines. 1 access hole in front · 115 m away
- 4003 Wrightwood RdMar 13, 2026Express: tub-to-shower conversion like for like tub replacement · 118 m away
- 1500 Kirkwood RdJun 26, 202535 tunnel below the foundation to replace entire cast-iron drain system. 2 access holes - 1 right 1 left · 119 m away
- 1412 Kirkwood RdDec 19, 2024Per tx gas emergency gas meter relocation · 125 m away
- 1410 Kirkwood RdDec 16, 2024Run power to shed[ 130 square feet] · 130 m away