4214 Wilshire Pkwy
Austin, TX 78722
Water line replacement permitted at 4214 Wilshire Pkwy
A water line from the meter to the home at 4214 Wilshire Pkwy is being replaced, according to an Austin plumbing permit dated December 22, 2025. The permit describes a line approximately 20 to 30 feet long and has a status of Final.
Summarized from City of Austin records · updated Dec 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 22, 2025
- since Dec 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace water line from the meter to the home approximately 20 to 30 feet
- AppliedDec 18, 2025
- IssuedDec 22, 2025
- WorkDec '25 – Dec '25
- Final inspectionDec 26, 2025
Passed final inspection Dec 26, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace water line from the meter to the home approximately 20 to 30 feet
Replace water line from the meter to the home approximately 20 to 30 feet
City of Austin permitPlumbing PermitFinal- Record
- 2025-160189 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4214 Wilshire Pkwy
What is happening at 4214 Wilshire Pkwy in Austin?
An Austin plumbing permit describes replacing the water line from the meter to the home. The permit is dated December 22, 2025.
When was the water line replacement at 4214 Wilshire Pkwy permitted?
The City of Austin permit was filed on December 22, 2025. Its status is Final.
How long is the water line being replaced at 4214 Wilshire Pkwy?
The permit describes the water line as approximately 20 to 30 feet long.
Is a new home being built at 4214 Wilshire Pkwy?
The permit record describes a water line replacement from the meter to the home, not new home construction.
What is the permit number for work at 4214 Wilshire Pkwy?
The City of Austin plumbing permit number is 2025-160189 PP, filed December 22, 2025.
Also being built nearby
All of 78722- 4210 Wilshire PkwyJan 8, 2024Cap off w.ww · 43 m away
- 1409 Crestwood RdNov 14, 2023Addition/remodel · 47 m away
- 4209 Parkwood RdNov 21, 2023Install a 120/240 v 50 amp outlet for a new car charger unit from existing exterior panel at carport location · 51 m away
- 1503 Crestwood RdNov 16, 2026Ev install · 55 m away
- 4205 Wilshire PkwyJun 6, 2025Replacement of an existing water heater change out: install/ replace 40 gallon tank-type natural gas water heater · 59 m away
- 4213 Parkwood RdAug 15, 2025Brown - install new _6.7__kw rooftop solar system to existing residential only using backfed breaker · 67 m away
- 1604 Wilshire BlvdSep 10, 2025Replacement of an existing water heater replace 40 gallon natural gas water heater · 78 m away
- 4206 Wilshire PkwyJan 27, 2026Install new car charger to residence · 85 m away
- 4204 Wilshire PkwyOct 28, 2026Base: installing a backup battery system and additional meter socket · 93 m away
- 1410 Crestwood RdDec 12, 2024Addition/ remodel of existing 1-story single-family residential to include: 1 bedroom 2.5 bath attached 2-car garage laundry room attic storage and uncovered wood deck. interior remodel to include mudroom bedroom and bathrooms · 98 m away
- 1408 Crestwood RdSep 21, 2026Per tx gas we need to relocate the gas meter 15 away from hazardous area to a safe location. to close to windows door way ac crawl space vents · 99 m away
- 1406 Crestwood RdApr 19, 2024Replacement of complete existing central heat and air system with or without duct work · 103 m away