1110 E 51st St
Austin, TX 78723
Demolition permitted for existing retail building
Permits indicate the existing retail building at 1110 E 51st St is slated for demolition; the permit describes it as dating to about 1972. The City of Austin marked demolition permit 2026-028908 BP final on March 23, 2026. A separate permit to cap water and wastewater lines, 2026-034092 PP, was marked final on April 28, 2026; the records do not identify a replacement project.
Summarized from City of Austin records · updated Apr 28, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 28, 2026
- since Mar 23, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCap off water & wastewater
- AppliedMar 4, 2026
- IssuedApr 28, 2026
- WorkApr '26 – May '26
- Final inspectionMay 6, 2026
Passed final inspection May 6, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsCap off water & wastewater
Cap off water & wastewater
City of Austin permitPlumbing PermitFinal- Record
- 2026-034092 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Total demolition of existing 3250 retail building circa 1972. the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage
Total demolition of existing 3250 retail building circa 1972. the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage
City of Austin permitBuilding PermitFinal- Record
- 2026-028908 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1110 E 51st St
What is being built at 1110 E 51st St in Austin?
The available permits concern demolition of an existing retail building, not a new building. They do not identify what may be built afterward.
Is the retail building at 1110 E 51st St being demolished?
Yes. City of Austin demolition permit 2026-028908 BP was marked final on March 23, 2026.
When was demolition permitted at 1110 E 51st St?
The City of Austin marked demolition permit 2026-028908 BP final on March 23, 2026.
How old is the building being demolished at 1110 E 51st St?
The demolition permit describes the existing retail building as dating to about 1972.
What does permit 2026-034092 PP cover at 1110 E 51st St?
The permit is for capping water and wastewater lines. It was marked final on April 28, 2026.
Will new retail space replace the building at 1110 E 51st St?
The available records do not identify a replacement project or say whether new retail space is planned.
Also being built nearby
All of 78723- 1122 E 51st StApr 28, 2026Cap off & wastewater · 16 m away
- 1109 E 52nd StJul 14, 20262026-030442 bp cap sewer line 5 from property line/tap line is located left side of property at 1109 e 52nd st · 93 m away
- 5121 Cameron RdSep 17, 2026Cap off water and wastewater · 96 m away
- 1202 E 51st StJan 23, 2025**cap off with ww** demolition of (3) structures (apartment complex) approx. 22116 sq ft circa 1985 2024 153223 da - approved · 121 m away
- 1209 E 51st StJun 25, 2026Residence inn · 130 m away
- 5201 Cameron RdNov 4, 2025Installation of mechanical and electrical facility to tenant finish out · 148 m away
- 1200 Barbara Jordan Blvd · Ch Retail Fund-Austin MuellerNov 10, 2026Installation of a new internally illuminated channel letter sign for firehouse subs · 149 m away
- 1120 E 52nd StFeb 19, 2026Repair fire damage to building. replace metal siding on exterior of building · 153 m away
- 4911 S IH 35 Svrd NbMar 15, 2024New photovoltaic system 110.10kw (dc) 80.00 kw (ac) 227 panel · 157 m away
- 1209 E 52nd StSep 24, 2026Cap off water and wastewater · 167 m away
- 1200 E 52nd StOct 21, 2026Tear off and replace a tpo roof with a new tpo roof. existing multifamily building · 172 m away
- 1211 E 52nd StJul 21, 2025Cap off of water/wastewater of total demolition of 2900 sq ft wood glass asphalt circa 1955 slab to remain · 185 m away