groundranger
Recent · latest filing Jul 2025Residential

1300 Ridgehaven Dr

Austin, TX 78723

1300 Ridgehaven Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 1300 Ridgehaven Dr, Austin, TX 78723. The most recent, filed July 16, 2025, covers: “Request to disconnect we need to replace the existing cloth wire weatherhead and meter can”.

Compiled from City of Austin records · updated Jul 16, 2025

Projects
1
1 filings
Latest filing
Jul 16, 2025
since Jul 16, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Request to disconnect we need to replace the existing cloth wire weatherhead and meter can

  1. AppliedJul 15, 2025
  2. IssuedJul 16, 2025
  3. WorkJul '25 – Aug '25
  4. Final inspectionAug 18, 2025

Passed final inspection Aug 18, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Request to disconnect we need to replace the existing cloth wire weatherhead and meter can

    Request to disconnect we need to replace the existing cloth wire weatherhead and meter can

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1300 Ridgehaven Dr

What is being built at 1300 Ridgehaven Dr?

The latest filing (City of Austin permit 2025-087536 EP, July 16, 2025) covers request to disconnect we need to replace the existing cloth wire weatherhead and meter can.

How many permits and filings does 1300 Ridgehaven Dr have?

1 filing across 1 project, from July 16, 2025 to July 16, 2025.

Is there other construction near 1300 Ridgehaven Dr?

Yes. Nearby filings include 1301 Northridge Dr (replacement of complete existing central heat and air system with or without duct work, Aug 19, 2026); 1207 Ridgehaven Dr (replacement of complete existing central heat and air system with or without duct work, Mar 13, 2024); 1305 Ridgehaven Dr (tunnel under foundation to replace cast iron with sch 40 pvc for 2 full bathrooms kitchen and washer drain line with 2 access holes one located in the front left side of the home the second will be made in the right side by the garage area. total length of tunnel is approximately 65 feet. we will replace sewer line from the home to the city tap connection which is about 50 feet in the yard. we will also replace water line from the meter to the home and repipe water lines inside the home for 2 full batrhooms kitchen and washer box and to the water heater, Jun 3, 2026).

How do I get alerts for new permits at 1300 Ridgehaven Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78723
Email me when a new permit is filed