1502 Ridgehaven Dr
Austin, TX 78723
Drain rerouting work permitted at 1502 Ridgehaven Dr
A City of Austin plumbing permit filed December 16, 2025, covers an entry tunnel from the exterior of the home beneath its foundation. The tunnel is for rerouting the drain line to the bottom of the foundation and out to an exterior cleanout; the permit is listed as final.
Summarized from City of Austin records · updated Dec 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 16, 2025
- since Dec 16, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCreate entry tunnel from exterior of home and under foundation to re-plumb/re-route drain system up to bottom of foundation and out to exterior cleanout
- AppliedDec 15, 2025
- IssuedDec 16, 2025
- WorkDec '25 – Dec '25
- Final inspectionDec 26, 2025
Passed final inspection Dec 26, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectCreate entry tunnel from exterior of home and under foundation to re-plumb/re-route drain system up to bottom of foundation and out to exterior cleanout
Create entry tunnel from exterior of home and under foundation to re-plumb/re-route drain system up to bottom of foundation and out to exterior cleanout
City of Austin permitPlumbing PermitFinal- Record
- 2025-158736 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1502 Ridgehaven Dr
What is being built at 1502 Ridgehaven Dr?
A City of Austin plumbing permit covers a tunnel beneath the home’s foundation to reroute a drain line to an exterior cleanout. Permit 2025-158736 PP was filed December 16, 2025, and is listed as final.
Is a new house being built at 1502 Ridgehaven Dr?
The permit describes plumbing work at the existing home, not construction of a new house. It covers a tunnel beneath the foundation to reroute a drain line.
What plumbing work is planned at 1502 Ridgehaven Dr?
The permit describes creating an entry tunnel from outside the home and beneath its foundation to reroute the drain to an exterior cleanout. It was filed December 16, 2025.
When was the permit filed for 1502 Ridgehaven Dr?
The City of Austin filed plumbing permit 2025-158736 PP on December 16, 2025. Its listed status is final.
What is permit 2025-158736 PP for in Austin?
It covers creating a tunnel beneath a home’s foundation to reroute a drain line and connect it to an exterior cleanout at 1502 Ridgehaven Dr. The permit was filed December 16, 2025.
Also being built nearby
All of 78723- 1500 Ridgehaven DrFeb 4, 2026Express: foundation repair · 20 m away
- 1503 Ridgehaven DrOct 11, 2024Yard leak replacement and repiping cold and hot water lines · 45 m away
- 1503 Northridge DrOct 9, 2026Dig 15 of tunnel to repair broken pvc pipe · 48 m away
- 1507 Ridgehaven DrMar 11, 2026Repair sewer lines in already dug tunnel. we will also repair the 2 faint line for the kitchen · 63 m away
- 1508 Ridgehaven DrFeb 26, 2026Replace sewer yard line approx 100 feet · 65 m away
- 1423 Ridgehaven DrJun 17, 2026Replacement of complete existing central heat and air system with or without duct work replacement of the hvac system through austin energys home energy savings program · 70 m away
- 1509 Ridgehaven DrDec 2, 2025Run 15 of 1 black iron pipe to generator · 81 m away
- 1421 Ridgehaven DrFeb 19, 2026Replacement of complete existing central heat and air system with or without duct work like for like replacement of 3 ton gas furnace upflow system · 88 m away
- 1502 Larkwood DrSep 29, 2025Express- 3058 sq ft decking removal and replacement · 91 m away
- 1421 Northridge DrMay 7, 2025**reference 2024 021969 bp** homebuilder loop · 95 m away
- 1511 Northridge DrSep 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like 2.5ton vertical gas · 97 m away
- 1506 Larkwood DrSep 29, 2026Install 200amp oh service replacement · 102 m away