1709 Patton Ln
Austin, TX 78723
1709 Patton Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 1709 Patton Ln, Austin, TX 78723. The most recent, filed May 9, 2025, covers: “Emergency job - meter completely burnt ae removed meter and cut overhead. converting 3 phase to single phase since no appliances use 3 phase. installing new main disconnect panel adding grounding. ***emergency inspection done on 5/6/25-hyatt”.
Compiled from City of Austin records · updated May 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 9, 2025
- since May 9, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEmergency job - meter completely burnt ae removed meter and cut overhead. converting 3 phase to single phase since no appliances use 3 phase. installing new main disconnect panel adding grounding. ***emergency inspection done on 5/6/25-hyatt
- AppliedMay 6, 2025
- IssuedMay 9, 2025
- WorkMay '25 – May '25
- Final inspectionMay 12, 2025
Passed final inspection May 12, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectEmergency job - meter completely burnt ae removed meter and cut overhead. converting 3 phase to single phase since no appliances use 3 phase. installing new main disconnect panel adding grounding. ***emergency inspection done on 5/6/25-hyatt
Emergency job - meter completely burnt ae removed meter and cut overhead. converting 3 phase to single phase since no appliances use 3 phase. installing new main disconnect panel adding grounding. ***emergency inspection done on 5/6/25-hyatt
City of Austin permitElectrical PermitFinal- Record
- 2025-056203 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1709 Patton Ln
What is being built at 1709 Patton Ln?
The latest filing (City of Austin permit 2025-056203 EP, May 9, 2025) covers emergency job - meter completely burnt ae removed meter and cut overhead. converting 3 phase to single phase since no appliances use 3 phase. installing new main disconnect panel adding grounding. ***emergency inspection done on 5/6/25-hyatt.
How many permits and filings does 1709 Patton Ln have?
1 filing across 1 project, from May 9, 2025 to May 9, 2025.
Is there other construction near 1709 Patton Ln?
Yes. Nearby filings include 6603 Berkman Dr (short stop by kt's austin, inc, Mar 2, 2007); 6506 Hickman Ave (express: window for window replacement door for door replacement replace shingles only on roof replace estimated 1000 sq ft of hardie siding, Sep 4, 2025); 6615 Berkman Dr (gast test new valves, Sep 9, 2024).
How do I get alerts for new permits at 1709 Patton Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 6603 Berkman DrMar 2, 2007Short stop by kt's austin, inc · 56 m away
- 6506 Hickman AveSep 4, 2025Express: window for window replacement door for door replacement replace shingles only on roof replace estimated 1000 sq ft of hardie siding · 67 m away
- 6615 Berkman DrSep 9, 2024Gast test new valves · 77 m away
- 6504 Hickman AveSep 4, 2025Express: window for window replacement door for door replacement replace shingles only on roof replace estimated 1000 sq ft of hardie siding · 81 m away
- 6707 Berkman DrDec 11, 2025*only one building at this address* stand-alone permit for house panel - repair house panel due to panel being vandalized - austin energy removed meter due to unsafe conditions. repair dedicated circuit for future security system. **we need power for exterior lighting motion sensors video camera feeds. all pretty standard stuff. previously we rented stand alone security towers (those self-contained trailers with the solar panels pole and cameras at the top flashing lights etc.) but that became too costly for the property owner on a rental basis and did not cover all the areas of the property. our proposed security replaces that rental strategy and provides better security coverage with the cameras. to clarify we are not looking for this power to operate any of the apartments etc. they each have their own potential service in the future. this is the base panel or common area panel. everything on the security side is plug and play after that · 89 m away
- 6509 Berkman DrJun 20, 2025Replacing meter and breaker panel like for like · 93 m away
- 6502 Hickman AveSep 4, 2025Express: window for window replacement door for door replacement replace shingles only on roof replace estimated 1000 sq ft of hardie siding · 97 m away
- 6500 Hickman AveJul 9, 2025Eplan: residential expedited review - addition and remodel to existing 1-story duplex [4bed 2bath] work to include: first floor addition interior remodel garage conversion new beds new baths [5bed 5bath] · 113 m away
- 6501 Hickman AveJun 6, 2025New adu 1 bed/1 bath expand existing driveway · 129 m away
- 6510 Linda LnDec 6, 2024Replacement of complete existing central heat and air system with or without duct work 2 ton vertical gas · 131 m away
- 6409 Berkman DrJan 21, 2022Skyline on berkman · 143 m away
- 6409 Hickman AveNov 21, 2025Repair existing service to get power back on the home · 144 m away