groundranger
Historic · latest filing Jan 2025Residential

1945 Zach Scott St

Austin, TX 78723

Home upgrades include rooftop solar and EV charging equipment

Permits indicate home improvements at 1945 Zach Scott St, including a 6.48-kW rooftop solar installation permitted in February 2024 and EV charging equipment permitted in January 2025. Other records cover a roof replacement and central heating and air system work; the mechanical permit filed in August 2024 is listed as expired.

Summarized from City of Austin records · updated Jan 27, 2025

Projects
4
4 filings
Latest filing
Jan 27, 2025
since Nov 28, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replace main breaker - no meter can work install evse

  1. AppliedJan 20, 2025
  2. IssuedJan 27, 2025
  3. WorkJan '25 – Feb '25
  4. Final inspectionFeb 10, 2025

Passed final inspection Feb 10, 2025.

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. Replace main breaker - no meter can work install evse

    Replace main breaker - no meter can work install evse

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. 6.48 kw rooftop solar installatioin

    6.48 kw rooftop solar installatioin

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Express: replace roof with metal roof (non structural)

    Express: replace roof with metal roof (non structural)

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1945 Zach Scott St

What is being built at 1945 Zach Scott St in Austin?

City of Austin permits indicate home upgrades, including rooftop solar and EV charging equipment. The records do not identify a new building.

Is a new house being built at 1945 Zach Scott St?

The available permits describe work on an existing home, including solar, electrical, roof, and heating and air system work. They do not list a new house.

Is there a solar installation at 1945 Zach Scott St?

Yes. Permit 2024-013610 EP, filed February 15, 2024, lists a 6.48-kW rooftop solar installation and is marked final.

Is an EV charger being installed at 1945 Zach Scott St?

Permit 2025-006963 EP, filed January 27, 2025, describes electrical work to replace the main breaker and install EVSE. The permit is marked final.

Was the roof replaced at 1945 Zach Scott St?

A building permit filed November 28, 2023, lists a non-structural replacement with a metal roof. Permit 2023-150921 BP is marked final.

Is the heating and air system being replaced at 1945 Zach Scott St?

A mechanical permit filed August 23, 2024, describes replacement of the existing central heat and air system, with or without duct work. The permit is listed as expired.

Also being built nearby

All of 78723

More solar installs in 78723.

Email me when a new permit is filed