2011 Sunny Brook Dr

Austin, TX 78723

Drain-line repair beneath 2011 Sunny Brook Dr

A plumbing permit filed June 18, 2026, covers tunneling beneath the home's foundation to repair a broken PVC drain line serving the master and hall bathrooms. The work description mentions two access points, one in front of and one behind the house; it does not describe a new building.

Summarized from City of Austin records · updated Jun 18, 2026

Projects
1
1 filings
Latest filing
Jun 18, 2026
since Jun 18, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Tunnel under the foundation to repair a break in the pvc drain line in the master bathroom and hall bathroom with sch 40 pvc. there will be two access holds in front of and behind the house

  1. AppliedJun 4, 2026
  2. IssuedJun 18, 2026
  3. WorkJun '26 – Jul '26
  4. Final inspectionJul 31, 2026

Passed final inspection Jul 31, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Tunnel under the foundation to repair a break in the pvc drain line in the master bathroom and hall bathroom with sch 40 pvc. there will be two access holds in front of and behind the house

    Tunnel under the foundation to repair a break in the pvc drain line in the master bathroom and hall bathroom with sch 40 pvc. there will be two access holds in front of and behind the house

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2011 Sunny Brook Dr

What is happening at 2011 Sunny Brook Dr in Austin?

A City of Austin plumbing permit covers tunneling beneath the foundation to repair a broken PVC drain line. The permit, 2026-071051 PP, was filed June 18, 2026.

Is a new home being built at 2011 Sunny Brook Dr?

The permit describes a drain-line repair beneath the existing home's foundation, not new construction. It was filed June 18, 2026.

What plumbing work is permitted at 2011 Sunny Brook Dr?

Permit 2026-071051 PP describes repairing a broken PVC drain line with Schedule 40 PVC. The work involves tunneling beneath the foundation.

Which bathrooms are included in the repair at 2011 Sunny Brook Dr?

The permit description identifies the master bathroom and hall bathroom as the areas served by the broken drain line.

When was the plumbing permit filed for 2011 Sunny Brook Dr?

The City of Austin permit was filed June 18, 2026. Its permit number is 2026-071051 PP.

Does the permit for 2011 Sunny Brook Dr show the repair is complete?

The permit record lists its status as Final. It describes a permitted drain-line repair beneath the home's foundation.