groundranger
Active · latest filing Nov 2026Residential

2017 Zach Scott St

Austin, TX 78723

Permit covers central HVAC replacement at 2017 Zach Scott St

An active City of Austin permit filed November 12, 2026, covers replacing the existing central heating and air system, with or without duct work, at 2017 Zach Scott St. A separate permit for a 7.56-kW rooftop solar installation was finalized on September 16, 2024.

Summarized from City of Austin records · updated Nov 12, 2026

Projects
4
4 filings
Latest filing
Nov 12, 2026
since Jan 11, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Replacement of complete existing central heat and air system with or without duct work

  1. AppliedNov 5, 2026
  2. IssuedNov 12, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
4% through of the permit windowNov 12, 2026 → May 11, 2027

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. 7.56 kw rooftop solar installation

    7.56 kw rooftop solar installation

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replacement of an existing water heater

    Replacement of an existing water heater

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Add sub panel to provide power from main panel to electrical vehicle charger

    Add sub panel to provide power from main panel to electrical vehicle charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2017 Zach Scott St

What is being built at 2017 Zach Scott St in Austin?

The latest permit covers replacement of the existing central heating and air system, with or without duct work. It does not describe a new building.

Was a permit filed for HVAC work at 2017 Zach Scott St?

Yes. City of Austin permit 2026-146229 MP was filed November 12, 2026, and is listed as active.

Is the HVAC permit at 2017 Zach Scott St active?

Yes. Permit 2026-146229 MP is listed as active and covers replacing the existing central heat and air system.

Does 2017 Zach Scott St have rooftop solar?

A City of Austin electrical permit records a 7.56-kW rooftop solar installation. Permit 2024-109845 EP was finalized on September 16, 2024.

When was the latest permit filed for 2017 Zach Scott St?

The latest filing was November 12, 2026, for central heating and air system replacement under permit 2026-146229 MP.

Also being built nearby

All of 78723

More solar installs in 78723.

Email me when it passes final inspection