2108 Benwick Cir
Austin, TX 78723
2108 Benwick Cir: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2108 Benwick Cir, Austin, TX 78723 since January 31, 2024. The most recent, filed August 8, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Aug 8, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Aug 8, 2025
- since Jan 31, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 7, 2025
- IssuedAug 8, 2025
- WorkAug '25 – Dec '25
- Final inspectionDec 19, 2025
Passed final inspection Dec 19, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-100216 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2023-161306 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2108 Benwick Cir
What is being built at 2108 Benwick Cir?
The latest filing (City of Austin permit 2025-100216 MP, August 8, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 2108 Benwick Cir have?
2 filings across 2 projects, from January 31, 2024 to August 8, 2025.
Is there other construction near 2108 Benwick Cir?
Yes. Nearby filings include 2106 Benwick Cir (express remove existing siding to entire home & discard. install new james hardie fiber cement siding. remove 12 existing windows & replace with new double glass low-e argon gas simonton windows, Apr 25, 2024); 2105 Benwick Cir (emergency repairs to electrical service due to cloth riser burning up. emergency disconnect/reconnect and inspect was called in. replaced meter riser panel and grounding. repairs have already been completed and inspected, Feb 4, 2026); 2102 Benwick Cir (excavate a 35 yard line to repair yard line going upstream into the house, Mar 26, 2025).
How do I get alerts for new permits at 2108 Benwick Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 2106 Benwick CirApr 25, 2024Express remove existing siding to entire home & discard. install new james hardie fiber cement siding. remove 12 existing windows & replace with new double glass low-e argon gas simonton windows · 25 m away
- 2105 Benwick CirFeb 4, 2026Emergency repairs to electrical service due to cloth riser burning up. emergency disconnect/reconnect and inspect was called in. replaced meter riser panel and grounding. repairs have already been completed and inspected · 51 m away
- 2102 Benwick CirMar 26, 2025Excavate a 35 yard line to repair yard line going upstream into the house · 56 m away
- 2103 Fordham CvJul 24, 2026Replacement of subfloor sanitary sewer servicing primary and secondary bathrooms only; kitchen and washer box have been previously rerouted · 62 m away
- 2104 Brunswick DrNov 16, 2026Interior remodel - add bathroom to the converted space that is now an additional room · 73 m away
- 6600 Haney DrNov 17, 2026Replacement of an existing water heater replace existing water heater with new 40-gallon natural-gas tank unit · 73 m away
- 2101 Fordham CvMay 15, 2024Replaced prv in yard and replaced existing water heater · 79 m away
- 6400 Haney DrMar 6, 2024Sewer yard line 75 feet · 95 m away
- 6407 Haney DrJan 27, 2025Emergency repair - elderly woman no gas. gas line to hvac damaged · 105 m away
- 6410 Dorchester DrJan 30, 2024Right way to excavate entire trunk line and 2nd bathroom. we are replacing entire trunk line and entire both bathroom fixtures drains under slab. excluding kitchen drain line.tell right way to follow trunk line to both bathrooms in back of house. tunneling under the house to replace drain lines · 120 m away
- 6408 Dorchester DrJun 15, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system through austin energys weatherization rebate & loan program · 124 m away
- 2107 Brunswick DrMay 13, 2024Trench to replace approximately 100 of sewer pipe · 125 m away