2108 Tom Miller St
Austin, TX 78723
Permits cover a home EV charger and HVAC replacement
City of Austin permits indicate a Level 2 car charger was installed at this residential address, with the electrical permit filed July 16, 2025. A permit filed September 11, 2026, covers replacement of the existing central heating and air system.
Summarized from City of Austin records · updated Sep 11, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 11, 2026
- since Jul 16, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work like for like: 4t horizontal gas system
- AppliedSep 4, 2026
- IssuedSep 11, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 9, 2026
Passed final inspection Oct 9, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work like for like: 4t horizontal gas system
Replacement of complete existing central heat and air system with or without duct work like for like: 4t horizontal gas system
City of Austin permitMechanical PermitFinal- Record
- 2026-116447 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of level 2 car charger with #6 wire and 60a breaker. chargepoint flex. the customer has a 200a service
Installation of level 2 car charger with #6 wire and 60a breaker. chargepoint flex. the customer has a 200a service
City of Austin permitElectrical PermitFinal- Record
- 2025-086379 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2108 Tom Miller St
What is being built at 2108 Tom Miller St?
The permits describe home improvements, not a new building: installation of a Level 2 car charger and replacement of the existing central heat and air system.
Was an EV charger permitted at 2108 Tom Miller St?
Yes. Austin electrical permit 2025-086379 EP, filed July 16, 2025, covers a Level 2 car charger installation. The permit is marked final.
What kind of car charger was installed at this address?
The permit describes a ChargePoint Flex Level 2 charger with a 60-amp breaker and #6 wire. It is marked final.
Is the heating and air system being replaced at 2108 Tom Miller St?
Yes. Austin mechanical permit 2026-116447 MP, filed September 11, 2026, covers like-for-like replacement of the existing central heat and air system. The permit is marked final.
When were permits filed for work at 2108 Tom Miller St?
The electrical permit for the car charger was filed July 16, 2025. The mechanical permit for the heating and air system was filed September 11, 2026.
Also being built nearby
All of 78723- 2104 Tom Miller StFeb 28, 2024Deinstall/reinstall of existing solar system. ae. no changes being made · 14 m away
- 1908 Emma Long StSep 17, 2025Replace heat damaged 4-0 feeders from load side of meter to main breaker. install new 200 amp main breaker to match existing one. pecan street dual meter adapter in place will require ae to remove meter(s) service size to remain as existing 200 amp · 31 m away
- 1912 Emma Long StJul 1, 2024Replacement of complete existing central heat and air system with or without duct work · 44 m away
- 1916 Emma Long StDec 12, 2023Install new 7.11kw rooftop solar system for existing residential only · 55 m away
- 2204 Tom Miller StMar 4, 20248.1 kw rooftop solar installation · 62 m away
- 1904 Mc Closkey StSep 8, 2025Replacement of an existing water heater installing like./like g water heater · 64 m away
- 2012 Tom Miller StDec 15, 2025Replacement of an existing water heater replace current 8-9 year old tankless water heater in attic with new identical up-to-date product · 64 m away
- 1908 Mc Closkey StJul 24, 20243.36kw rooftop solar installation · 69 m away
- 1921 Emma Long StSep 11, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2 stage gas horizontal · 82 m away
- 1908 Antone StNov 5, 2024*partial demolition* addition/remodel-home renovation -raising the roof to accommodate the two bedrooms removing a bathroom on the first floor extending the side porch changing first floor plan · 95 m away
- 1905 Littlefield StJan 30, 20256.3 kw rooftop solar installation · 104 m away
- 1916 Antone StFeb 13, 2024Install of roof mounted solar panels · 106 m away