groundranger
Active · latest filing Sep 2026Residential

2108 Tom Miller St

Austin, TX 78723

Permits cover a home EV charger and HVAC replacement

City of Austin permits indicate a Level 2 car charger was installed at this residential address, with the electrical permit filed July 16, 2025. A permit filed September 11, 2026, covers replacement of the existing central heating and air system.

Summarized from City of Austin records · updated Sep 11, 2026

Projects
2
2 filings
Latest filing
Sep 11, 2026
since Jul 16, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work like for like: 4t horizontal gas system

  1. AppliedSep 4, 2026
  2. IssuedSep 11, 2026
  3. WorkSep '26 – Oct '26
  4. Final inspectionOct 9, 2026

Passed final inspection Oct 9, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacement of complete existing central heat and air system with or without duct work like for like: 4t horizontal gas system

    Replacement of complete existing central heat and air system with or without duct work like for like: 4t horizontal gas system

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of level 2 car charger with #6 wire and 60a breaker. chargepoint flex. the customer has a 200a service

    Installation of level 2 car charger with #6 wire and 60a breaker. chargepoint flex. the customer has a 200a service

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2108 Tom Miller St

What is being built at 2108 Tom Miller St?

The permits describe home improvements, not a new building: installation of a Level 2 car charger and replacement of the existing central heat and air system.

Was an EV charger permitted at 2108 Tom Miller St?

Yes. Austin electrical permit 2025-086379 EP, filed July 16, 2025, covers a Level 2 car charger installation. The permit is marked final.

What kind of car charger was installed at this address?

The permit describes a ChargePoint Flex Level 2 charger with a 60-amp breaker and #6 wire. It is marked final.

Is the heating and air system being replaced at 2108 Tom Miller St?

Yes. Austin mechanical permit 2026-116447 MP, filed September 11, 2026, covers like-for-like replacement of the existing central heat and air system. The permit is marked final.

When were permits filed for work at 2108 Tom Miller St?

The electrical permit for the car charger was filed July 16, 2025. The mechanical permit for the heating and air system was filed September 11, 2026.

Also being built nearby

All of 78723
Email me when a new permit is filed