2213 Zach Scott St
Austin, TX 78723
Bathroom remodel permitted at 2213 Zach Scott St
Permits indicate an interior remodel at 2213 Zach Scott St to convert a half bath into a full bath and turn a closet into a shower. Austin issued the building permit on June 15, 2026, and the plumbing permit on June 18, 2026.
Summarized from City of Austin records · updated Jun 18, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jun 18, 2026
- since Jun 15, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayInterior remodel- remodeling a half bath into full bath. transforming closet into shower. shower drain line diverter installation. upgrades
- AppliedMar 2, 2026
- IssuedJun 18, 2026
- WorkJun '26 – Mar '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsInterior remodel- remodeling a half bath into full bath. transforming closet into shower. shower drain line diverter installation. upgrades
Interior remodel- remodeling a half bath into full bath. transforming closet into shower. shower drain line diverter installation. upgrades
City of Austin permitPlumbing PermitActive- Record
- 2026-069292 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel- remodeling a half bath into full bath. transforming closet into shower. shower drain line diverter installation. upgrades
Interior remodel- remodeling a half bath into full bath. transforming closet into shower. shower drain line diverter installation. upgrades
City of Austin permitBuilding PermitActive- Record
- 2026-069292 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2213 Zach Scott St
What is being remodeled at 2213 Zach Scott St?
Permits describe converting a half bath into a full bath and transforming a closet into a shower, with plumbing upgrades.
When was the bathroom remodel at 2213 Zach Scott St permitted?
The building permit was filed June 15, 2026, and the plumbing permit was filed June 18, 2026.
What are the permit numbers for 2213 Zach Scott St?
The permits are 2026-069292 BP for building work and 2026-069292 PP for plumbing work.
Is a new home being built at 2213 Zach Scott St?
The available Austin permits describe an interior remodel, not construction of a new home.
What plumbing work is planned at 2213 Zach Scott St?
The permit description includes installing a shower drain line diverter as part of the bathroom remodel. The plumbing permit, 2026-069292 PP, was filed June 18, 2026.
Also being built nearby
All of 78723- 2212 Zach Scott StMay 30, 2025Replacement of complete existing central heat and air system with or without duct work · 13 m away
- 2208 Zach Scott StOct 3, 2025Install new 6.800 kw rooftop solar system and 13.5 kw energy storage system for existing residential only · 17 m away
- 2205 Zach Scott StApr 8, 20243.24 kw rooftop solar · 21 m away
- 2225 Zach Scott StJul 22, 2026Replacement of an existing water heater replacing like/like g water heater · 31 m away
- 4132 Gochman StAug 8, 2025Express - removing and replacing 29 windows like for like · 48 m away
- 4128 Gochman StAug 13, 2026Tunnel 10 from edge of porch to broken fitting under home. we will replace all exposed piping · 59 m away
- 4141 Mattie StOct 15, 2024Express: replace tub/shower with acrylic shower base and walls replace valves and fixtures · 62 m away
- 2249 Zach Scott StOct 31, 2024Replacement of complete existing central heat and air system with or without duct work · 68 m away
- 4212 Gochman StMar 4, 20246.885 kw solar installation · 77 m away
- 4120 Gochman StDec 5, 2023Express install metal roof (non-structural) · 79 m away
- 4217 Gochman StAug 3, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 100 m away
- 2113 Zach Scott StJun 3, 2026Replacement of an existing water heater · 101 m away