2300 Vanderbilt Cir
Austin, TX 78723
2300 Vanderbilt Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 2300 Vanderbilt Cir, Austin, TX 78723. The most recent, filed November 16, 2026, covers: “Tunnel under foundation to replumb complete drain system up to bottom of foundation and out to exterior line. approx 60ft of tunnel”.
Compiled from City of Austin records · updated Nov 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 16, 2026
- since Nov 16, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayTunnel under foundation to replumb complete drain system up to bottom of foundation and out to exterior line. approx 60ft of tunnel
- AppliedNov 9, 2026
- IssuedNov 16, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel under foundation to replumb complete drain system up to bottom of foundation and out to exterior line. approx 60ft of tunnel
Tunnel under foundation to replumb complete drain system up to bottom of foundation and out to exterior line. approx 60ft of tunnel
City of Austin permitPlumbing PermitActive- Record
- 2026-147268 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2300 Vanderbilt Cir
What is being built at 2300 Vanderbilt Cir?
The latest filing (City of Austin permit 2026-147268 PP, November 16, 2026) covers tunnel under foundation to replumb complete drain system up to bottom of foundation and out to exterior line. approx 60ft of tunnel.
How many permits and filings does 2300 Vanderbilt Cir have?
1 filing across 1 project, from November 16, 2026 to November 16, 2026.
Is there other construction near 2300 Vanderbilt Cir?
Yes. Nearby filings include 7007 Northeast Dr (replacement of an existing water heater, Mar 28, 2025); 6909 Northeast Dr (replacement of condenser only condenser and evaporator only, May 30, 2025); 2405 Stevens Cv (reroute of the gas line. approx. 54 ft. existing gas line in living room rerouted in attic around living room down from attic to fireplace in ceiling, Sep 16, 2026).
How do I get alerts for new permits at 2300 Vanderbilt Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 7007 Northeast DrMar 28, 2025Replacement of an existing water heater · 34 m away
- 6909 Northeast DrMay 30, 2025Replacement of condenser only condenser and evaporator only · 88 m away
- 2405 Stevens CvSep 16, 2026Reroute of the gas line. approx. 54 ft. existing gas line in living room rerouted in attic around living room down from attic to fireplace in ceiling · 98 m away
- 2307 Vanderbilt CirSep 9, 2025Replacement of an existing water heater change out: install/ replace 50 gallon tank-type natural gas water heater · 103 m away
- 2211 Vanderbilt LnMar 26, 2024Replacement of an existing water heater · 112 m away
- 2404 Stevens CvAug 11, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton vertical gas · 113 m away
- 2403 Stevens CvDec 4, 2023Replacement of an existing water heater · 131 m away
- 2404 Akron CvFeb 13, 2024Tunnel - replace all pvc underground · 137 m away
- 2306 Loyola LnDec 8, 2025Upgrade electrical service to 200 amp change meter base and main panel add new riser penetrated through roof add supplemental grounding system whole home surge protection · 137 m away
- 2400 Loyola LnJun 27, 2025Express - replace 1 existing windows - size for size · 142 m away
- 2402 Loyola LnJun 26, 2026Install level 2 ev charger · 146 m away
- 2200 Vanderbilt LnSep 30, 2025New install · 147 m away