2911 Rogge Ln
Austin, TX 78723
Plumbing repairs permitted at 2911 Rogge Lane
City of Austin records show plumbing repairs at 2911 Rogge Ln, not a new building project. A permit to replace the pressure-reducing valve in the yard was filed July 6, 2026; an earlier permit for a sewer yard-line replacement was filed September 13, 2023.
Summarized from City of Austin records · updated Jul 6, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 6, 2026
- since Jul 6, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace prv in yard
- AppliedJul 1, 2026
- IssuedJul 6, 2026
- WorkJul '26 – Jul '26
- Final inspectionJul 15, 2026
Passed final inspection Jul 15, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplace prv in yard
Replace prv in yard
City of Austin permitPlumbing PermitFinal- Record
- 2026-084632 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace sewer yard line from house connection to city tap
Replace sewer yard line from house connection to city tap
City of Austin permitPlumbing PermitFinal- Record
- 2023-118507 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2911 Rogge Ln
What is being built at 2911 Rogge Ln in Austin?
The records do not show a new building. They show plumbing work, including replacement of a yard pressure-reducing valve and a sewer yard line.
What work was permitted at 2911 Rogge Ln in 2026?
City of Austin permit 2026-084632 PP, filed July 6, 2026, covers replacing the pressure-reducing valve in the yard. Its status is listed as Final.
Was a sewer line replacement permitted at 2911 Rogge Ln?
Yes. Permit 2023-118507 PP, filed September 13, 2023, covers replacing the sewer yard line from the house connection to the city tap. Its status is listed as Final.
Is a new home or addition planned at 2911 Rogge Ln?
The two listed permits are for plumbing work; the records provided do not identify a new home or addition.
When were permits filed for work at 2911 Rogge Ln?
The listed filings are dated September 13, 2023, and July 6, 2026. Both are City of Austin plumbing permits.
Also being built nearby
All of 78723- 3003 Rogge LnDec 21, 2023Express foundation repair on slab foundation · 48 m away
- 2907 Rogge LnJun 30, 2025Express: foundation repair · 48 m away
- 2910 Rogge LnJul 1, 2020Manor forest ii · 52 m away
- 2905 Rogge LnDec 8, 2023Enclose/remove garage & exterior door. insert window towards front of home. bathroom placed on back wall of house to allow for plumbing and drainage. lights installed in bathroom and bedroom · 71 m away
- 5609 Overbrook DrJul 29, 2025Install new 7.11kw rooftop solar system to existing residential only using a backfed breaker · 75 m away
- 5604 Darlington LnFeb 6, 2026Demolition old driveway. construct new driveway approach of 10 ft · 82 m away
- 5611 Overbrook DrAug 5, 2025Express: full roof replacement and decking replacement (not past decking) · 88 m away
- 5605 Overbrook DrJun 10, 2025Express: interior non-structural exploratory work for evaluation only. no interior changes to layout or square footage. layout review for ep 2025-028984 · 92 m away
- 3007 Rogge LnJul 28, 2025Express - roof removal sheathing removal and replacement and removal and replacement of all roofing facets · 99 m away
- 5603 Darlington LnMar 14, 2025Upgrade an existing old overhead service to 200amps · 102 m away
- 5602 Darlington LnDec 17, 2025Construct new driveway approach of 10 ft · 105 m away
- 5604 Gloucester LnApr 25, 2024Express: foundation repair · 120 m away