3108 E 51st St
Austin, TX 78723
Home system upgrades permitted at 3108 E 51st St
Austin permits at this address cover replacement heating and air systems, an EV charger, and a water-softener installation. The filings include a mechanical permit dated August 22, 2025, another dated June 2, 2026, and an active plumbing permit dated September 3, 2026.
Summarized from City of Austin records · updated Sep 3, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Sep 3, 2026
- since Sep 26, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsNot pre-plumbed water softener install
Not pre-plumbed water softener install
City of Austin permitPlumbing PermitActive- Record
- 2026-112482 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work install replacement of 2 ton heat pump system and replace the return & supply plenum
Replacement of complete existing central heat and air system with or without duct work install replacement of 2 ton heat pump system and replace the return & supply plenum
City of Austin permitMechanical PermitFinal- Record
- 2026-066671 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-102707 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2024-128886 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3108 E 51st St
What is being built at 3108 E 51st St?
The permit records show home system upgrades, not a new building project. They cover heating and air system replacements, an EV charger, and a water-softener installation.
What work was permitted at 3108 E 51st St in 2026?
A mechanical permit for a replacement 2-ton heat pump system was filed June 2, 2026 (2026-066671 MP). An active plumbing permit for a water-softener installation was filed September 3, 2026 (2026-112482 PP).
Is a new home being built at 3108 E 51st St?
The records provided show permits for work on existing home systems and an EV charger; they do not list a new-home construction permit for this address.
When was the heating and air system replaced at 3108 E 51st St?
Mechanical permits for replacement of the existing central heating and air system were filed August 22, 2025 (2025-102707 MP) and June 2, 2026 (2026-066671 MP). Both are listed as final.
Was an EV charger permitted at 3108 E 51st St?
Yes. An electrical permit to install a Level 2 EV charger was filed September 26, 2024 (2024-128886 EP) and is listed as final.
Also being built nearby
All of 78723- 5006 Pecan Springs RdNov 26, 20185006 pecan springs road · 115 m away
- 5002 Pecan Springs RdMar 2, 2022St stephens square · 142 m away
- 5007 Pecan Springs RdApr 25, 2016St stephen's square phase four · 166 m away
- 5201 Wayborne Hill DrFeb 27, 202520 tunnel below the foundation to replace remainder of cast-iron drain system. 1 access hole in front · 170 m away
- 5009 Pecan Springs RdNov 6, 2026Base: installing a backup battery system and additional meter socket · 177 m away
- 5110 Wayborne Hill DrMay 30, 2024Emergency - home occupied customer has damage to the riser austin energy has disconnected customers power and is requesting to repair the riser and change out the meter socket · 192 m away
- 5001 Pecan Springs RdNov 5, 2026New 2-story sfr with 1 car garage · 202 m away
- 3016 E 51st StMay 7, 2026Installation of 1 dual port level 2 ev charger · 207 m away
- 5200 Wayborne Hill DrApr 3, 2026Repipe gas line to furnace from plugged tee to furnace run dedicated line from meter to tankless and resolve venting issue · 207 m away
- 3001 E 51st StSep 17, 2024Lawn sprinklers · 219 m away
- 5215 Medford DrFeb 13, 2026Express: remove and replace shingles. redecking roof · 227 m away
- 5212 Medford DrFeb 17, 2026Tunnel under foundation to replace cast iron drain lines for 1 full bathroom kitchen and washer drain line. two access holes will be made one on the right back side of the home the second would be outside the bathrooms total length of tunnel is approximately 35 feet · 229 m away