groundranger
Historic · latest filing May 2025Residential

3203 Loyola Ln

Austin, TX 78723

3203 Loyola Ln: 4 projects on record

City of Austin lists 4 filings across 4 projects at 3203 Loyola Ln, Austin, TX 78723 since May 12, 2025. The most recent, filed May 13, 2025, covers: “We will be pushing out the wall of the hallway and putting in a bathroom. a new entry into the back bedrooms will be added for access. wall is not load bearing. our roof is a howe truss system with all weight from roof distributed to exterior walls. no interior wall is on the midline. (pictures and drawings included). cost is low due to doing the work ourselves and using reclaimed materials”.

Compiled from City of Austin records · updated May 13, 2025

Projects
4
4 filings
Latest filing
May 13, 2025
since May 12, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

We will be pushing out the wall of the hallway and putting in a bathroom. a new entry into the back bedrooms will be added for access. wall is not load bearing. our roof is a howe truss system with all weight from roof distributed to exterior walls. no interior wall is on the midline. (pictures and drawings included). cost is low due to doing the work ourselves and using reclaimed materials

  1. AppliedApr 8, 2025
  2. IssuedMay 13, 2025
  3. WorkMay '25 – Nov '25
  4. Final inspectionNov 26, 2025

Passed final inspection Nov 26, 2025.

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. We will be pushing out the wall of the hallway and putting in a bathroom. a new entry into the back bedrooms will be added for access. wall is not load bearing. our roof is a howe truss system with all weight from roof distributed to exterior walls. no interior wall is on the midline. (pictures and drawings included). cost is low due to doing the work ourselves and using reclaimed materials

    We will be pushing out the wall of the hallway and putting in a bathroom. a new entry into the back bedrooms will be added for access. wall is not load bearing. our roof is a howe truss system with all weight from roof distributed to exterior walls. no interior wall is on the midline. (pictures and drawings included). cost is low due to doing the work ourselves and using reclaimed materials

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. We will be pushing out the wall of the hallway and putting in a bathroom. a new entry into the back bedrooms will be added for access. wall is not load bearing. our roof is a howe truss system with all weight from roof distributed to exterior walls. no interior wall is on the midline. (pictures and drawings included). cost is low due to doing the work ourselves and using reclaimed materials. revision: re-piping drain lines through tunnel under slab

    We will be pushing out the wall of the hallway and putting in a bathroom. a new entry into the back bedrooms will be added for access. wall is not load bearing. our roof is a howe truss system with all weight from roof distributed to exterior walls. no interior wall is on the midline. (pictures and drawings included). cost is low due to doing the work ourselves and using reclaimed materials. revision: re-piping drain lines through tunnel under slab

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. We will be pushing out the wall of the hallway and putting in a bathroom. a new entry into the back bedrooms will be added for access. wall is not load bearing. our roof is a howe truss system with all weight from roof distributed to exterior walls. no interior wall is on the midline. (pictures and drawings included). cost is low due to doing the work ourselves and using reclaimed materials

    We will be pushing out the wall of the hallway and putting in a bathroom. a new entry into the back bedrooms will be added for access. wall is not load bearing. our roof is a howe truss system with all weight from roof distributed to exterior walls. no interior wall is on the midline. (pictures and drawings included). cost is low due to doing the work ourselves and using reclaimed materials

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. We will be pushing out the wall of the hallway and putting in a bathroom. a new entry into the back bedrooms will be added for access. wall is not load bearing. our roof is a howe truss system with all weight from roof distributed to exterior walls. no interior wall is on the midline. (pictures and drawings included). cost is low due to doing the work ourselves and using reclaimed materials

    We will be pushing out the wall of the hallway and putting in a bathroom. a new entry into the back bedrooms will be added for access. wall is not load bearing. our roof is a howe truss system with all weight from roof distributed to exterior walls. no interior wall is on the midline. (pictures and drawings included). cost is low due to doing the work ourselves and using reclaimed materials

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 3203 Loyola Ln

What is being built at 3203 Loyola Ln?

The latest filing (City of Austin permit 2025-057744 MP, May 13, 2025) covers we will be pushing out the wall of the hallway and putting in a bathroom. a new entry into the back bedrooms will be added for access. wall is not load bearing. our roof is a howe truss system with all weight from roof distributed to exterior walls. no interior wall is on the midline. (pictures and drawings included). cost is low due to doing the work ourselves and using reclaimed materials.

How many permits and filings does 3203 Loyola Ln have?

4 filings across 4 projects, from May 12, 2025 to May 13, 2025.

Is there other construction near 3203 Loyola Ln?

Yes. Nearby filings include 3205 Loyola Ln (*****request to disconnect****** service rebuild to 200 amp service, May 15, 2024); 3207 Loyola Ln (express: replace 2 windows- like for like, Oct 22, 2024); 3105 Loyola Ln (15 trench to replace cast iron sewer drain through back breezeway, Dec 19, 2024).

How do I get alerts for new permits at 3203 Loyola Ln?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78723
Email me when a new permit is filed