Rooftop solar and electrical panel work at 3517 Cepeda St
City of Austin permits indicate a 9.57-kilowatt rooftop solar system is being installed at the existing home at 3517 Cepeda St. The solar permit was filed January 28, 2026, after a January 13 permit to disconnect and reconnect the electrical service for a main distribution panel upgrade; both permits are marked final.
Summarized from City of Austin records · updated Jan 28, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 28, 2026
- since Jan 13, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new 9.57 kw rooftop solar system for existing residential only
- AppliedJan 12, 2026
- IssuedJan 28, 2026
- WorkJan '26 – Nov '26
- Final inspectionNov 12, 2026
Passed final inspection Nov 12, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall new 9.57 kw rooftop solar system for existing residential only
Install new 9.57 kw rooftop solar system for existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2026-003830 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Disconnect/reconnect to upgrade main distribution panel
Disconnect/reconnect to upgrade main distribution panel
City of Austin permitElectrical PermitFinal- Record
- 2026-002631 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3517 Cepeda St
What is being built at 3517 Cepeda St?
City of Austin permit 2026-003830 EP describes installation of a 9.57-kilowatt rooftop solar system at an existing residence. A separate permit covers an electrical panel upgrade.
Is a new home being built at 3517 Cepeda St?
The solar permit describes work at an existing residence. The records provided do not indicate a new home construction project.
When was the solar permit filed for 3517 Cepeda St?
The City of Austin filed permit 2026-003830 EP on January 28, 2026. Its status is final.
What electrical work is planned at 3517 Cepeda St?
Permit 2026-002631 EP, filed January 13, 2026, describes disconnecting and reconnecting service to upgrade the main distribution panel. Its status is final.
How large is the solar system at 3517 Cepeda St?
The City of Austin permit describes a new 9.57-kilowatt rooftop solar system.
Also being built nearby
All of 78723- 3604 Tom Miller StMay 22, 2026Install residential irrigation system · 20 m away
- 3515 Cepeda StMar 26, 2020Cepeda street park · 24 m away
- 3606 Tom Miller StJun 9, 2025Install new irrigation system with backflow device · 37 m away
- 3510 Tom Miller StJan 14, 2026Installation of new irrigation · 37 m away
- 3600 Tom Miller StNov 25, 2025Installation of new irrigation · 48 m away
- 3506 Tom Miller StDec 2, 2025Construct new driveway approach of 18 ft and sidewalk of 70 lf · 51 m away
- 3504 Tom Miller StJan 14, 2026Installation of new irrigation · 76 m away
- 3502 Tom Miller StJan 14, 2026Installation of new irrigation · 81 m away
- 3501 Cepeda StMay 29, 2024Install new gas line from meter to generator · 97 m away
- 3901 Margarita StMay 23, 2024Corner lot; construct 2 new sidewalks of 147 lf with ada ramps and new driveway approach of 17 ft. driveway approach is from the alley · 101 m away
- 3500 Tom Miller StJan 14, 2026Installation of new irrigation · 102 m away
- 3905 Margarita StMay 30, 2024Construct new driveway approach of 17 ft and sidewalk of 147 lf · 111 m away
More warehouses & industrial in 78723, solar installs in 78723.