groundranger
Recent · latest filing Jan 2026Residential

3517 Cepeda St

Austin, TX 78723

Rooftop solar and electrical panel work at 3517 Cepeda St

City of Austin permits indicate a 9.57-kilowatt rooftop solar system is being installed at the existing home at 3517 Cepeda St. The solar permit was filed January 28, 2026, after a January 13 permit to disconnect and reconnect the electrical service for a main distribution panel upgrade; both permits are marked final.

Summarized from City of Austin records · updated Jan 28, 2026

Projects
2
2 filings
Latest filing
Jan 28, 2026
since Jan 13, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new 9.57 kw rooftop solar system for existing residential only

  1. AppliedJan 12, 2026
  2. IssuedJan 28, 2026
  3. WorkJan '26 – Nov '26
  4. Final inspectionNov 12, 2026

Passed final inspection Nov 12, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install new 9.57 kw rooftop solar system for existing residential only

    Install new 9.57 kw rooftop solar system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Disconnect/reconnect to upgrade main distribution panel

    Disconnect/reconnect to upgrade main distribution panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 3517 Cepeda St

What is being built at 3517 Cepeda St?

City of Austin permit 2026-003830 EP describes installation of a 9.57-kilowatt rooftop solar system at an existing residence. A separate permit covers an electrical panel upgrade.

Is a new home being built at 3517 Cepeda St?

The solar permit describes work at an existing residence. The records provided do not indicate a new home construction project.

When was the solar permit filed for 3517 Cepeda St?

The City of Austin filed permit 2026-003830 EP on January 28, 2026. Its status is final.

What electrical work is planned at 3517 Cepeda St?

Permit 2026-002631 EP, filed January 13, 2026, describes disconnecting and reconnecting service to upgrade the main distribution panel. Its status is final.

How large is the solar system at 3517 Cepeda St?

The City of Austin permit describes a new 9.57-kilowatt rooftop solar system.

Also being built nearby

All of 78723

More warehouses & industrial in 78723, solar installs in 78723.

Email me when a new permit is filed