groundranger
Historic · latest filing Jan 2024Residential

3809 Tilley St

Austin, TX 78723

3809 Tilley St: 2 projects on record

City of Austin lists 2 filings across 2 projects at 3809 Tilley St, Austin, TX 78723 since December 15, 2023. The most recent, filed January 17, 2024, covers: “Install new 8.36kw rooftop solar system and 27kw energy storage system for existing residential only”.

Compiled from City of Austin records · updated Jan 17, 2024

Projects
2
2 filings
Latest filing
Jan 17, 2024
since Dec 15, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new 8.36kw rooftop solar system and 27kw energy storage system for existing residential only

  1. AppliedDec 11, 2023
  2. IssuedJan 17, 2024
  3. WorkJan '24 – Jun '24
  4. Final inspectionJul 13, 2026

Passed final inspection Jul 13, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install new 8.36kw rooftop solar system and 27kw energy storage system for existing residential only

    Install new 8.36kw rooftop solar system and 27kw energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Disconnect/reconnect power to tie in pv/ess components.we are not upgrading the size of the service not upgrading the meter size

    Disconnect/reconnect power to tie in pv/ess components.we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 3809 Tilley St

What is being built at 3809 Tilley St?

The latest filing (City of Austin permit 2023-157862 EP, January 17, 2024) covers install new 8.36kw rooftop solar system and 27kw energy storage system for existing residential only.

How many permits and filings does 3809 Tilley St have?

2 filings across 2 projects, from December 15, 2023 to January 17, 2024.

Is there other construction near 3809 Tilley St?

Yes. Nearby filings include 3803 Tilley St (install 7.56 kw dc solar system, Nov 13, 2024); 3810 Tilley St (replacement of complete existing central heat and air system with or without duct work, Dec 8, 2025); 3804 Tilley St (we will install a new 60a standard circuit in the 200a main service panel, Aug 25, 2026).

How do I get alerts for new permits at 3809 Tilley St?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78723

More warehouses & industrial in 78723, solar installs in 78723.

Email me when a new permit is filed