4807 Bundyhill Dr
Austin, TX 78723
Plumbing permit for drain-line work at 4807 Bundyhill Dr
A City of Austin plumbing permit covers tunneling under the home’s slab to access and replace master bathroom drain lines. The permit was filed September 17, 2026, and is marked final.
Summarized from City of Austin records · updated Sep 17, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 17, 2026
- since Sep 17, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under slab up to 20 to expose and replace master bathroom group drain lines under home. tunnel access hole located on side of home
- AppliedSep 3, 2026
- IssuedSep 17, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 26, 2026
Passed final inspection Oct 26, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel under slab up to 20 to expose and replace master bathroom group drain lines under home. tunnel access hole located on side of home
Tunnel under slab up to 20 to expose and replace master bathroom group drain lines under home. tunnel access hole located on side of home
City of Austin permitPlumbing PermitFinal- Record
- 2026-115989 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4807 Bundyhill Dr
What is being built at 4807 Bundyhill Dr?
A City of Austin permit covers a tunnel under the home’s slab to expose and replace master bathroom group drain lines. It is plumbing repair work, not a new building.
What work is planned at 4807 Bundyhill Dr in Austin?
Permit 2026-115989 PP describes tunneling under the slab, with an access hole on the side of the home, to replace drain lines serving the master bathroom.
When was the plumbing permit filed for 4807 Bundyhill Dr?
The City of Austin filed plumbing permit 2026-115989 PP on September 17, 2026. Its status is listed as final.
Is a new home being built at 4807 Bundyhill Dr?
The available permit describes plumbing work beneath an existing home, not construction of a new home.
What is permit 2026-115989 PP for?
It is a City of Austin plumbing permit for tunneling under the home’s slab to expose and replace master bathroom drain lines. The permit date is September 17, 2026.
Also being built nearby
All of 78723- 4805 Bundyhill DrMar 12, 2025Express: replace siding on home · 17 m away
- 4812 Carsonhill DrSep 26, 2024Replace service - main panel and meter can · 38 m away
- 4804 Bundyhill DrNov 14, 2024Install ev plug · 52 m away
- 4816 Carsonhill DrNov 18, 2024Addn to existing res to create family room 11/18/24 life safety inspection of the residence to occur for purposes of a revised issued certificate of occupancy · 53 m away
- 4801 Bundyhill DrNov 21, 202310 sewer tunnel · 64 m away
- 4802 Bundyhill DrSep 25, 2024Express - replace window like for like and repair plumbing · 66 m away
- 4806 Carsonhill DrAug 22, 2024New 1-story 1 bedroom 2 bathroom dwelling unit · 81 m away
- 4811 Carsonhill DrApr 20, 2026Replacement of an existing water heater replacement of natural gas water heater like for like · 86 m away
- 4901 Howden CirSep 10, 202580 tunnel below the foundation to repair entire pvc drain system. 3 access holes - left right right · 91 m away
- 4807 Carsonhill DrJun 5, 2025Storm damage emergency to replace the meter socket & riser as detached from structure. ***storm related-emergency inspection done on 6/3/25. ahi fee and espa required-hyatt · 97 m away
- 4901 Single Shot CirJun 25, 2026Express: foundation repair · 101 m away
- 4807 Single Shot CirJun 25, 2025Replacement of complete existing central heat and air system with or without duct work · 104 m away