groundranger
Historic · latest filing Jul 2024Residential

4815 Walden Cir

Austin, TX 78723

4815 Walden Cir: 2 projects on record

City of Austin lists 2 filings across 2 projects at 4815 Walden Cir, Austin, TX 78723 since May 10, 2024. The most recent, filed July 25, 2024, covers: “20 ft tunnel to repair separated pipe between the main sewer line and the bathroom line. access on right side of house”.

Compiled from City of Austin records · updated Jul 25, 2024

Projects
2
2 filings
Latest filing
Jul 25, 2024
since May 10, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

20 ft tunnel to repair separated pipe between the main sewer line and the bathroom line. access on right side of house

  1. AppliedJul 11, 2024
  2. IssuedJul 25, 2024
  3. WorkJul '24 – Aug '24
  4. Final inspectionAug 20, 2024

Passed final inspection Aug 20, 2024.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. 20 ft tunnel to repair separated pipe between the main sewer line and the bathroom line. access on right side of house

    20 ft tunnel to repair separated pipe between the main sewer line and the bathroom line. access on right side of house

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Express: foundation repair (8 steel push piers)

    Express: foundation repair (8 steel push piers)

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4815 Walden Cir

What is being built at 4815 Walden Cir?

The latest filing (City of Austin permit 2024-085984 PP, July 25, 2024) covers 20 ft tunnel to repair separated pipe between the main sewer line and the bathroom line. access on right side of house.

How many permits and filings does 4815 Walden Cir have?

2 filings across 2 projects, from May 10, 2024 to July 25, 2024.

Is there other construction near 4815 Walden Cir?

Yes. Nearby filings include 4811 Walden Cir (eplan: residential expedited review - addition and remodel to existing 1-story single family res. [4bed 3bath] work to include: first floor addition second floor addition interior remodel, May 28, 2026); 5112 Single Shot Cir (express: remove and replace all exterior wood siding fascia soffit and trim with fiber- cement siding (hardie) primed and painted. replace rotted sheathing as needed. replace chimney siding. no changes to wall openings footprint or roofline, Aug 13, 2025); 5113 Single Shot Cir (replacement of an existing water heater, Jun 24, 2024).

How do I get alerts for new permits at 4815 Walden Cir?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78723
Email me when a new permit is filed