4915 Single Shot Cir
Austin, TX 78723
4915 Single Shot Cir: 2 projects on record
City of Austin lists 2 filings across 2 projects at 4915 Single Shot Cir, Austin, TX 78723. The most recent, filed December 20, 2023, covers: “Installation of solar with the main panel upgrade with backfeed breaker”.
Compiled from City of Austin records · updated Dec 20, 2023
- Projects
- 2
- 2 filings
- Latest filing
- Dec 20, 2023
- since Dec 20, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of solar with the main panel upgrade with backfeed breaker
- AppliedAug 8, 2023
- IssuedDec 20, 2023
- WorkDec '23 – Jan '24
- Final inspectionJan 9, 2024
Passed final inspection Jan 9, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstallation of solar with the main panel upgrade with backfeed breaker
Installation of solar with the main panel upgrade with backfeed breaker
City of Austin permitElectrical PermitFinal- Record
- 2023-101386 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of solar panels on customers home this is for an upgrade of the main service panel
Installation of solar panels on customers home this is for an upgrade of the main service panel
City of Austin permitElectrical PermitFinal- Record
- 2023-104771 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4915 Single Shot Cir
What is being built at 4915 Single Shot Cir?
The latest filing (City of Austin permit 2023-101386 EP, December 20, 2023) covers installation of solar with the main panel upgrade with backfeed breaker.
How many permits and filings does 4915 Single Shot Cir have?
2 filings across 2 projects, from December 20, 2023 to December 20, 2023.
Is there other construction near 4915 Single Shot Cir?
Yes. Nearby filings include 4913 Single Shot Cir (express: install 14 total pilings (11 exterior 1 breakout 2 interior), Apr 2, 2026); 4909 Single Shot Cir (replacement of complete existing central heat and air system with or without duct work belinda wilson, Aug 13, 2026); 4906 Bundyhill Dr (***emergency*** replacing underground meter can (150 amps), May 8, 2024).
How do I get alerts for new permits at 4915 Single Shot Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 4913 Single Shot CirApr 2, 2026Express: install 14 total pilings (11 exterior 1 breakout 2 interior) · 23 m away
- 4909 Single Shot CirAug 13, 2026Replacement of complete existing central heat and air system with or without duct work belinda wilson · 64 m away
- 4906 Bundyhill DrMay 8, 2024***emergency*** replacing underground meter can (150 amps) · 82 m away
- 4711 Star Jasmine DrNov 27, 2024Installation of a roof-mounted solar panel system 4.895 · 100 m away
- 4709 Star Jasmine DrJul 1, 2025Gas leak reroute section of gas pipe as repair · 104 m away
- 4719 Star Jasmine DrJul 10, 2025Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 106 m away
- 4904 Bundyhill DrFeb 26, 2025Interior remodel and garage conversion of sfr (fire damage) - roof replacement framing repairs moving interior wall joining garage and kitchen to add sq ft to kitchen. replacement of flooring drywall doors finishes and cabinetry electrical and hvac replacement · 107 m away
- 4801 Star Jasmine DrJan 16, 2024Installation of new irrigation · 118 m away
- 5011 Single Shot CirAug 19, 2025Express: remove and replace siding (like for like). remove and replace composition shingle like for like revision-electrical work ***austin energy is requiring the meter socket and service riser be replaced. in doing so we are upgrading the electrical panel to 200amps · 124 m away
- 5106 Single Shot CirJul 24, 2025Install new 3.280 kw rooftop solar system for existing residential only · 127 m away
- 4902 Single Shot CirJun 5, 2024Replacement of an existing water heater · 129 m away
- 4912 Carsonhill DrFeb 19, 2024Edwards - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps · 132 m away
More solar installs in 78723.