groundranger
Historic · latest filing Dec 2024Residential

5105 Bundyhill Cir

Austin, TX 78723

5105 Bundyhill Cir: 1 project on record

City of Austin lists 1 filing across 1 project at 5105 Bundyhill Cir, Austin, TX 78723. The most recent, filed December 31, 2024, covers: “Removal and replacement of hindered pvc piping under slab. ***per pc tunneling 20ft to repair bathroom pvc piping”.

Compiled from City of Austin records · updated Dec 31, 2024

Projects
1
1 filings
Latest filing
Dec 31, 2024
since Dec 31, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Removal and replacement of hindered pvc piping under slab. ***per pc tunneling 20ft to repair bathroom pvc piping

  1. AppliedDec 20, 2024
  2. IssuedDec 31, 2024
  3. WorkDec '24 – Jan '25
  4. Final inspectionJan 15, 2025

Passed final inspection Jan 15, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Removal and replacement of hindered pvc piping under slab. ***per pc tunneling 20ft to repair bathroom pvc piping

    Removal and replacement of hindered pvc piping under slab. ***per pc tunneling 20ft to repair bathroom pvc piping

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5105 Bundyhill Cir

What is being built at 5105 Bundyhill Cir?

The latest filing (City of Austin permit 2024-165962 PP, December 31, 2024) covers removal and replacement of hindered pvc piping under slab. ***per pc tunneling 20ft to repair bathroom pvc piping.

How many permits and filings does 5105 Bundyhill Cir have?

1 filing across 1 project, from December 31, 2024 to December 31, 2024.

Is there other construction near 5105 Bundyhill Cir?

Yes. Nearby filings include 5106 Bundyhill Cir (excavate 9 tunnel and 7 trench to repair main sewer line serving bathroom, Jan 10, 2025); 4601 Broadhill Dr (the property experienced damage due storms in the area. the meter can and overhead riser were ripped out of the structure. we plan to replace meter & riser conduit only. existing main service panel to remain as is. our goal is to restore power to customer as soon as possible, Apr 20, 2026); 4703 Carsonhill Dr (upgrade service to 200a and install a span main breaker panel, Dec 7, 2025).

How do I get alerts for new permits at 5105 Bundyhill Cir?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78723
Email me when a new permit is filed